Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 2, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of a municipal facility in Clewiston, Florida. Completed plans call for the renovation of a municipal facility.
Reference Number 0000414558 The Housing Department of the Seminole Tribe of Florida is requesting bids from qualified contractors to provide ADA renovation services needed at Big Cypress Reservation. Question Deadline 03/26/2026 at 5:00 PM ET Questions in response to this solicitation must be submitted through BidNet Direct by the Deadline for Questions Due Date and time detailed in this solicitation. Attendees must stay for the duration of the Pre-Bid Conference and may not leave until they are dismissed by the TRIBE's Project Manager. Scope of Work - The Scope of Work (SOW) contained in the Attachments as Attachment A – Scope of Work describes the services expected for CONTRACTOR to provide the TRIBE. BIDDER must ensure all such services contained in Attachment A are provided for in every particular and shall meet or exceed the level of quality, availability, features, functionality, frequency, accuracy, and performance. GENERAL: o Schedules should be submitted with all bids and updated any time there is a change o Contractors are expected to work Monday-Friday, 8:00AM - 5:00PM unless otherwise specified by the TRIBE's Project Manager o No work shall be performed on Tribal events, holidays, and advisory emergencies, unless otherwise determined by the TRIBE. o When installing new drywall in bedroom, living room, etc., backing must be provided for TVs being mounted on the wall o Place a chase and an outlet at the same area where backing is located o Seal all recess lighting, caulk the lights to the ceiling o Caulk around all exterior lights o All exterior light fixtures must be LED o Any penetration that are made through the wall to the exterior must be caulked orsealed o Any new gutters must have leaf guard o Any roof repairs/replacement must follow Miami-Dade standardsBATHROOM: o All wood cabinets are required at all times, when like for like is stated if current cabinet is particle board, include in the bid the price to replace with all wood o Due-rock on walls in the shower or tub area o All joints, corners, and around windows must be sealed with red guard o Extend the Dur-rock 2' on all sides beyond the shower or tub o Shower floor mortar bed, no foam or any other products should be used o Minimum 2-4% pre-slope o Liner should be water tested for 24 hours o Minimum 6 inches o All floor tile should be slip/skid resistant o Shower floor tile should be a maximum of 2x2 mesh o Provide backing for all walls inside tub/shower areas between 32" and 38" o Faucets should be Kohler or Delta o From shower diverter to shower head piping must be copper tubing and copper fittings o Secure the diverter and pipe fittings securely o When tiling the walls extend 2 feet passed the shower or tub o ADA bathroom the entire bathroom must be tile a minimum of 4 feet o All toilets must be Kohler highline o All exhaust must be vented through the roof or soffit o The exhaust fan and light for the bathroom must be on the same switch o All paint must be high gloss 2.3. KITCHEN: o All wood cabinets are required at all times, when like for like is stated if current cabinet is particle board, include in the bid the price to replace with all wood o All sinks should be deep double drop in sinks o Faucets should be Delta with a pull out spray hose o Moisture resistant (purple) drywall o Cabinet screws should be a minimum of 2 1/2 inches o Efforts should be made to find a stud o If drywall is removed from floor to ceiling, blocking must be provided for upper and lower cabinets o All microwave and kitchen hoods must be exhausted outside MECHANICAL/HVAC: o All AC units must be installed on a metal stand with a secondary pan and connect float switch o A primary float switch must be installed and connected o When replacing duct work all joints and seams must be taped and mastic o All new HVAC units must be a minimum of 16 seer o All flexible ducts mut be a minimum of R8 R-value All disconnects should be the pull type non-fuse o Rheem, Goodman, Night and Day units preferred o Caulk around all AC vents o Keyed lockout caps must be on all units 2.5. WATER HEATERS: o GE brand, replaced like for like gallon size o Drain pan required o TRV piped to the outside o All water heaters should have a separate shut off switch o New code required Energy conservation code chapter 4 o Heat traps are mandatory
Award
Municipal
$50,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
