BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a military facility in Sparks, Nevada. Completed plans call for the renovation of a military facility.

Construction of an asphalt trail connecting the upper visitor center to the lower Acastus Trail and replacement of an existing 36-inch corrugated metal pipe. Work includes clearing and grubbing, removing asphalt, excavation, and embankment. Existing trail material is to be removed, conserved, and reused for shouldering and subgrade of resting pads, with shoulders sloped at a maximum of 1:10 and all aggregate materials retained onsite. Native subbase must be graded and prepared prior to placement. The asphalt trail shall be 6 feet wide with a 3-inch depth and a maximum 2 percent cross slope, placed over a 4-inch aggregate base. Testing of aggregate base, asphalt, and concrete shall comply with FP-24. Asphalt resting pads shall be 4 feet by 6 feet with a 3-inch depth and a maximum 2 percent cross slope in all directions, placed on a water-compacted aggregate base. Concrete curb shall be NDOT Type 5, including a spillway to the culvert inlet, and may be set on compacted aggregate base, with native subbase compacted with water and inspected before placement. Backfilling to the top of curb shall use native material. Culvert work includes submitting a proposed pipe plot for placement of the new 36-inch culvert with a minimum 5 percent drop and removal of the existing culvert, inlet stacked rock, and outlet riprap. All work necessary to extend the asphalt trail and shoulders is included in the option items. Period of Performance: 06/01/2026 to 09/30/2026 Questions shall be submitted via email to derrick.dodson@usda.gov and are due no later than March 31st, 2026, at 3:00 PM Mountain Time. This will ensure enough time to respond before the solicitation period ends.

Post-Bid

Military

$670,000.00

Public - Federal

Renovation

16

3

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
49
Bidding Soon
578
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

June 1, 2026

Project location map

To Be Determined, Sparks, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.