BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2026 at 8:00 PM

Updated April 3, 2026

Site work and paving for a sidewalk / parking lot in San Diego, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Project is located within the public right-of-way of B Street, bounded by Kettner Boulevard to the east and the Santa Fe Depot rail platforms to the west in downtown San Diego, California. This construction project involves demolition of existing asphalt concrete and concrete pavements, bollards, fencing, and tree removal. Excavation, grading, construction of a masonry fence with a mural painting, and architectural concrete pavement with brick paving enhancements. the estimated construction duration for this project is 132 Working Days. QA date - 3-19-2026 Question Submit No Later than seven (7) days prior to the time of the bid opening. Question Submit Online.

Post-Bid

Sidewalks / Parking Lot

$656,000.00

Public - City

Paving, Site Work

16

5

10

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
15
Bidding Soon
867
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

April 27, 2026

Project location map

B St, San Diego, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.