BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2026 at 8:00 PM

Updated March 18, 2026

Site work and new construction of a mixed-use development in Wisconsin Rapids, Wisconsin. Conceptual plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Project will be complete using in-house staff The project scope includes site preparation, masonry, plumbing, HVAC, electrical, and finishes for the construction of the new Dexter Park Campground Pavilion, which will have new masonry walls, slab on grade, bathrooms, kitchen, exterior seating area, installation of plumbing fixtures, interior finishes, lighting, electrical outlets, exterior doors, roofing, fascia, and soffit. The project also includes the construction of the new South Wood County Park Shower Building, consisting of new masonry walls, slab on grade, shower rooms, installation of plumbing fixtures, interior finishes, lighting, electrical outlets, exterior doors, roofing, fascia, and soffit. Completion date for the work at this building is September 15th, 2026 The bidder must inform the architect architect if drawings are acquired digitally to ensure inclusion in bidders list and distribution of additional contract documents including addendums. Bidder's that acquire documents electronically without informing the architect in writing will not be allowed to submit a bid. No proposal shall be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and a performance and payment bond in the amount of the contract price within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the owner as liquidated damages. Prequalification of bidders will not be required. Bidders to whom award of a contract is under consideration may be asked to submit to the Architect, a properly executed AIA Document A305 Contactor's Qualification Statement. See attached Instructions to Bidders for more information. No Bid proposal may be withdrawn for a period of sixty (30) days after the bid opening without the consent of the Owner. The Owner reserves the right to reject any or all bids, waive or not waive irregularities in the bids received and to accept any proposal which they deem most favorable to the interests of the Owner. Selected Bidders agree to sign all necessary contracts, and provide performance bond for 100% of awarded bid amount, within 15 days of award notification

Project Abandoned

Playgrounds / Parks / Athletic Fields

$2,000,000.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
1
Bidding Soon
466
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

April 17, 2026

Project location map

Multiple Locations, Wisconsin Rapids, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.