Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 19, 2026 at 8:00 PM
Updated March 20, 2026
Renovation of an educational facility in New Haven, Missouri. Completed plans call for the renovation of a educational facility.
General Contractors are invited to submit sealed bids for renovating the exterior of the shop building located on the New Haven School District Campus at 100 Park Drive, New Haven, MO 63068. Instructions to bidders and project specifications can be obtained by emailing the Superintendent or viewed on the district website. Tin and Gutters o Remove existing metal siding and install new Central States R-Loc 26-gauge metal panels on all three (3) sides of the high school shop building. o Remove existing gutters and downspouts; install new 26-gauge box gutters with downspouts. Windows o Remove all existing windows. o Reinstall the following windows: o One (1) window in the shop classroom o Two (2) windows in the wood shop o Two (2) windows in the weight room o Windows to be Quaker E300 Series, 68" x 36". o Frame window openings using Cee channel and girt clips. Insulation & Thermal Protection o Remove existing wall insulation and reinstall walls with R-19 long-tab vinyl-backed insulation. Long tabs to allow taping of laps during future interior metal panel installation. Install insulation using sky hooks. o Install thermal break tape over existing exterior purlins to prevent cold transfer. Ventilation (Wood Shop) o Install one (1) new mechanical louver with rain hood. o Dayton motorized damper, Model 3C728, with weather hood Model 1WBW1. o Install one (1) exhaust fan with rain hood in the wood shop: o Dayton sidewall exhaust fan, Model 484X50, with weather hood Model 1WBW2. o Exhaust fan and motorized damper to be wired to the same switch. Doors o Remove existing glass double door in the weight room and install a new hollow metal double door with glass windows. Interior Patching o Patch interior window openings not being replaced by installing vinyl-backed insulation or an approved alternate product to ensure safety and proper enclosure. Question Deadline 03/04/2026 Please contact Dr. Josh Hoener for any questions, requests for clarification or interpretations. Email: hoener@newhavenschools.us Telephone: (573) 237-3231 Address: 100 Park Dr. New Haven, MO 63068
Award
Educational
$62,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2026
June 1, 2026
100 Park Dr, New Haven, MO
Related To This Project
New Haven, MO
Bid Date: Mar 06 2026
New Haven, MO
Bid Date: Feb 04 2026
New Haven, MO
Bid Date: Apr 08 2025
New Haven, MO
Bid Date: Dec 04 2023
New Haven, MO
Bid Date: Mar 16 2022
New Haven, MO
Bid Date: Feb 10 2022
New Haven, MO
--
Mansfield, MO
Bid Date: Mar 12 2026
Jefferson City, MO
Bid Date: Mar 12 2026
Diggins, MO
Bid Date: Mar 24 2026
Nixa, MO
Bid Date: Mar 10 2026
Caruthersville, MO
Bid Date: Mar 13 2026
Mexico, MO
Bid Date: Feb 28 2026
Branson, MO
Bid Date: Mar 20 2026
Mexico, MO
Bid Date: Mar 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
