Published May 11, 2026 at 8:00 PM
Updated May 15, 2026
Site work and paving for a mixed-use development in Minneapolis, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Major Items of Work Are Approximately: 1 Lump Sum as Built; 1 Lump Sum Mobilization; 1 Each Field Office; 1 Each Clearing; 75 Each Grubbing; 0.52 Acre Grubbing; 1 Lump Sum Building Removal; 3 Each Remove Pipe Apron; 9 Each Remove Drainage Structure; 73 Each Remove Sign; 1 Each Remove Light Foundation; 1 Each Salvage Hydrant and Valve; 1 Each Salvage Lighting Unit; 6 Each Salvage Sign; 31 Each Salvage Sign Panel; 10704 Lin Ft Sawing Bituminous Pavement (Full Depth); 723 Lin Ft Remove Sewer Pipe (Storm); 3337 Lin Ft Remove Curb and Gutter; 1943 Lin Ft Remove Bituminous Curb; 160 Lin Ft Remove Retaining Wall; 519 Lin Ft Remove Wood Fence; 510 Lin Ft Salvage Retaining Wall; 91 Sq Yd Remove Concrete Driveway Pavement; 1850 Sq Yd Remove Bituminous Driveway Pavement; 9535 Sq Yd Remove Bituminous Pavement; 4242 Sq Ft Remove Concrete Walk; 1 Lump Sum Haul Salvaged Material; 40 Each Relocate Boulder; 2 Each Remove Vehicle Speed Feedback Sign; 125 Sq Ft Salvage Brick Pavers; 7379 Cu Yd Excavation - Common; 732 Cu Yd Excavation - Subgrade; 2726 Cu Yd Select Granular Embankment (Cv); 5297 Cu Yd Common Embankment (Cv); 70 Hour Street Sweeper (With Pickup Broom); 23 M Gallon Water; 2150 Gallon Calcium Chloride Solution; 843 Cu Yd Aggregate Base (Cv) Class 6; 2633 Ton Bituminous Patching Mixture; 500 Sq Yd Mill Bituminous Surface; 459 Sq Yd Mill Bituminous Surface (1.5"); 17212 Sq Yd Mill Bituminous Surface (3.0"); 2916 Ton Type Sp 9.5 Wearing Course Mixture (3,c); 11 Lin Ft Concrete Steps-design Special; 118 Cu Yd Fine Filter Aggregate (Cv); 1 Each 15" Rc Pipe Apron; 3 Each 18" Rc Pipe Apron; 1 Each 24" Rc Pipe Apron; 1 Each 28" Span Rc Pipe-arch Apron; 4 Each 15" Gs Safety Apron; 2 Each 18" Rc Safety Apron; 1 Each 30" Rc Safety Apron; 93 Lin Ft 15" Cs Pipe Culvert; 1392 Lin Ft 4" Perf Pe Pipe Drain; 13 Lin Ft 6" Ductile Iron Pipe Sewer Cl 52; 153 Lin Ft 28" Span Rc Pipe-arch Sewer Class Iva; 26 Lin Ft 12" Rc Pipe Sewer Design 3006 Class V; 774 Lin Ft 15" Rc Pipe Sewer Design 3006 Class V; 1468 Lin Ft 18" Rc Pipe Sewer Design 3006 Class Iii; 293 Lin Ft 24" Rc Pipe Sewer Design 3006 Class Iii; 82 Lin Ft 30" Rc Pipe Sewer Design 3006 Class Iii; 4 Each Connect to Existing Storm Sewer; 1 Each Plug and Abandon Pipe Sewer; 1 Each Connect to Existing Water Main; 1 Each Install Hydrant and Valve; 4 Each Adjust Hydrant and Gate Valve; 20 Each Adjust Gate Valve and Box; 1 Each 6" Gate Valve and Box; 1 Each Relocate Curb Stop and Box; 9 Each Adjust Curb Stop; 110 Lin Ft Inspection Hole; 50 Pound Ductile Iron Fittings; 41 Each Casting Assembly; 29 Each Adjust Frame and Ring Casting; 34.1 Lin Ft Construct Drainage Structure Design N; 87.5 Lin Ft Construct Drainage Structure Design 48-4020; 51.5 Lin Ft Construct Drainage Structure Design 60- 4020; 11.2 Lin Ft Construct Drainage Structure Design 72-4020; 2 Each Structure Baffle; 1 Each Connect Into Existing Drainage Structure; 1 Each Construct Drainage Structure Design Special 1; Clarification Deadline: 3/17/2026 2:00 PM Direct questions about this Project, including pre-bid questions, to Eric Drager at Eric.Drager@hennepin.us. 1 Each Construct Drainage Structure Design Special 2; 37.4 Sq Yd Geotextile Filter Type 3; 8.2 Cu Yd Random Riprap Class Ii; 2808 Sq Ft 4" Concrete Walk; 2356 Sq Ft 6" Concrete Walk; 281 Each Drill and Grout Reinf Bar (Epoxy Coated); 5215 Sq Ft Concrete Curb Ramp Walk; 8019 Lin Ft Concrete Curb and Gutter Design B424; 53 Lin Ft Concrete Curb and Gutter Design B612; 226 Lin Ft Concrete Curb and Gutter Design B618; 380 Lin Ft Concrete Curb and Gutter Design B624; 76 Lin Ft Concrete Curb and Gutter Design D412; 133 Lin Ft Concrete Curb and Gutter Design D424; 665 Sq Yd 6" Concrete Driveway Pavement; 208 Sq Yd 8" Concrete Driveway Pavement; 309 Lin Ft Concrete Sill; 540 Lin Ft Concrete Curb and Gutter; 116 Lin Ft Concrete Curb Design V; 631 Sq Ft Truncated Domes; 29 Each Relocate Mail Box Support; 58 Sq Ft Install Brick Pavers; 1 Each Light Foundation Design E; 1 Each Install Lighting Unit; 5 Each Guide Post Type B; 1 Lump Sum Traffic Control Supervisor; 1 Lump Sum Traffic Control; 1 Lump Sum Alternate Pedestrian Route; 2 Each Vehicle Speed Feedback Sign; 3 Each Portable Changeable Message Sign; 100 Sq Ft Construction Sign-special; 31 Each Install Sign Panel; 6 Each Install Sign; 430.51 Sq Ft Sign; 1 System Pedestrian Crosswalk Flasher System; 33 Each Tree Protection; 1 Lump Sum Stabilized Construction Exit; 1 Lump Sum Erosion Control Supervisor; 50 Each Storm Drain Inlet Protection; 23 Each Culvert End Controls; 2810 Lin Ft Silt Fence, Type Ms; 32 Lin Ft Flotation Silt Curtain Type Still Water; 11267 Lin Ft Sediment Control Log Type Wood Fiber; 1.72 Acre Subsoiling; 5.13 Acre Soil Bed Preparation; 941 Pound Fertilizer Type 1; 248 Pound Fertilizer Type 3; 1 Pound Fertilizer Type 4; 3427 Sq Yd Rolled Erosion Prevention Category 20; 109 Sq Yd Rolled Erosion Prevention Category 25; 3.41 Acre Seeding; 1.72 Acre Weed Spraying; 3.42 Acre Rapid Stabilization Method 2; 0.45 Gallon Weed Spray Mixture; 8073 Pound Hydraulic Stabilized Fiber Matrix; 1 Lump Sum Permanent Vegetation Maintenance; 102 Pound Seed Southern Boulevard; 412 Pound Seed Turfgrass; 1 Pound Seed Wet Ditch; 19 Pound Seed Southern Tallgrass Roadside; 24050 Lin Ft Mobile Retroreflectometer Measurements; 440 Lin Ft 6" Solid Line Multi-component; 20 Lin Ft 6" Dotted Line Multi-component; 267 Lin Ft 4" Double Solid Line Multi-component; 6697 Lin Ft 6" Solid Line Multi-component Ground in; 46 Lin Ft 6" Dotted Line Multi-component Ground in; 5476 Lin Ft 4" Double Solid Line Multi-component Ground in; 110 Lin Ft 24" Solid Line Preform Thermo Ground in; 15 Sq Ft Pavement Message Preform Thermoplastic Ground in; 363 Sq Ft Crosswalk Preform Thermoplastic Ground in Enhanced Skid Resistance; 1 Lump Sum Mobilization Area 1; 1 Each Remove Gate Valve and Box; 20 Lin Ft Remove Water Main; 60 Sq Yd Remove Bituminous Driveway Pavement; 275 Sq Yd Remove Bituminous Pavement; 56 Cu Yd Excavation - Common; 14 Cu Yd Excavation - Subgrade; 12 Cu Yd Select Granular Embankment (Cv); 56 Cu Yd Aggregate Base (Cv) Class 6; 6 Ton Type Sp 9.5 Wearing Course Mixture (2,b); 70 Ton Type Sp 9.5 Wearing Course Mixture (2,c); 50 Ton Pipe Bedding Material; 2200 Pound Ductile Iron Fittings; 2 Each Connect to Existing Water Main; 6 Each Hydrant; 25 Each 1" Corporation Stop; 6 Each 6" Gate Valve and Box; 2 Each 8" Gate Valve and Box; 4 Each 12" Gate Valve and Box; 25 Each 1" Curb Stop and Box; 225 Lin Ft Water Service Trench Excavation; 600 Lin Ft Water Service (Directional Drilled); 41 Lin Ft 6" Watermain Ductile Iron Cl 52; 420 Lin Ft 8" Pvc Watermain; 584 Lin Ft 12" Pvc Watermain; 1350 Lin Ft 12" Pvc Watermain (Directional Drilled); 7 Sq Yd 4" Polystyrene Insulation; 5 Each Casting Assembly Special; 1 Lump Sum Traffic Control Area 1; 500 Lin Ft Sediment Control Log Type Wood Fiber; 0.01 Acre Subsoiling; 0.06 Acre Soil Bed Preparation; 35 Cu Yd Common Topsoil Borrow; 8 Pound Fertilizer Type 3; 150 Pound Hydraulic Stabilized Fiber Matrix; 8 Pound Seed Turfgrass; All in Accordance With Specifications and Bid Forms. Clarification Deadline 3/24/2026 2:00 PM
Award
Roads / Highways
$4,152,042.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2026
May 1, 2026
Mill St, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Mar 09 2026
Minneapolis, MN
Bid Date: Mar 31 2026
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Apr 09 2026
Minneapolis, MN
Bid Date: Mar 19 2026
Minneapolis, MN
Bid Date: Mar 30 2026
Minneapolis, MN
Bid Date: Jun 03 2026
Minneapolis, MN
Bid Date: Mar 20 2026
Minneapolis, MN
Bid Date: Mar 31 2026
Minneapolis, MN
Bid Date: Mar 09 2026
Minneapolis, MN
Bid Date: Mar 24 2026
Minneapolis, MN
Bid Date: Apr 02 2026
Minneapolis, MN
Bid Date: Mar 18 2026
Minneapolis, MN
Bid Date: Mar 12 2026
Minneapolis, MN
Bid Date: Mar 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.