BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2026 at 8:00 PM

Updated March 31, 2026

Asbestos abatement and renovation of an educational facility in Elgin, Illinois. Working plans call for the renovation of a educational facility; and for asbestos abatement for a educational facility.

The Board of Education of School District U-46, Kane County, Illinois hereby gives notice that sealed lump sum bids will be received for the Larsen Middle School 665 Dundee Ave. Elgin, IL 60120, Abatement and Lead Tile Removal Project. In this project, the work includes but is not limited to: removal of asbestos containing materials and lead tile. Question Deadline 03/12/2026 at 1:30 PM CT , Online Portal The scope of work for the project at Larsen Middle School includes: Please note, First and Second Floor design details (e.g. decontamination unit, waste out unit, barriers, etc.) shall be determined/phased prior to the start of the project. ? Removal and disposal of asbestos containing thermal system insulation as identified on design drawings ENV-01 through ENV-06 and itemized as follows: ? Thermal system insulation in Staff Room 003, Cafeteria 005, Food Service 006, Office 006A, Water Heater/Storage 006B, Toilet Room 006C, Boy’s Locker Room 136 Shower Area, Storage 136C, Girl’s Locker Room 137 Shower Area, Girl’s Locker Room 137 Shower Stalls, Lower Level Stairwell 2, and North Pipe Tunnel. Abatement contractor shall utilize gross removal methods. The abatement contractor is responsible for demolition of ceilings to access thermal system insulation. Removal and disposal shall include ceiling materials, in their entirety, as ACM waste. ? Thermal system insulation in Storage 109D and adjacent Door 6 Vestibule, Main Office 120, Conference Room 121, Principal’s Office 123, Dean’s Office 125, Nurse’s Office 126, and Nurse’s Toilet Room 126A. Abatement contractor shall utilize glovebag removal methods. Saw-cutting of the concrete subfloor to access thermal system insulation shall be provided by other. ? Thermal system insulation in Toilet Room 100A. Abatement contractor shall utilize glovebag removal methods. Walls to be removed include the south wall to access thermal system insulation. The abatement contractor is responsible for demolition of walls as necessary to access thermal system insulation located behind. The abatement contractor shall coordinate the extent of wall demolition required with the District and onsite consultant. ? Thermal system insulation in Staff Toilet Room 203A. Abatement contractor shall utilize glovebag removal methods. Walls to be removed include the east and south walls to access thermal systemv Glazed block in the Girl’s Toilet Room 203C. Walls to be removed include the north and south walls to access thermal system insulation. ? Glazed block in the Boy’s Toilet Room 208A. Walls to be removed include the north, east, and south walls to access thermal system insulation. ? Glazed block in the Corridor adjacent to Science Lab 202. Walls to be removed include the west wall (riser behind lockers) to access thermal system insulation. ? Glazed block in the Corridor adjacent to Classroom 205. Walls to be removed include the east wall (drinking fountain) to access thermal system insulation. ? Glazed block in the Corridor adjacent to Classroom 208. Walls to be removed include the west wall (drinking fountain) to access thermal system insulation Intent to Bid by Mar 20, 2026 1:30 PM CDT. This project has been cancelled

Final Planning

Educational

$300,000.00

Public - County

Asbestos Abatement, Renovation

8

6

2

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
5
Bidding Soon
2,433
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2026

May 28, 2026

Project location map

665 Dundee Ave, Elgin, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.