BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 2, 2026 at 8:00 PM

Updated April 3, 2026

Renovation of an educational facility in Charlevoix, Michigan. Completed plans call for the renovation of a educational facility.

The work consists of a comprehensive upgrade of the Temperature Control / Facility Management Control System at Charlevoix Middle/High School, including replacement and upgrade of the existing Building Automation System (BAS) and associated HVAC controls. Major components include deployment of the latest supported Niagara Framework (N4) to a provided Windows Server, migration of the existing Elementary School configuration, development of a High School graphical interface mirroring the Elementary School layout, removal and replacement of all existing unitary controllers with native BACnet controllers, replacement of legacy controls in the gym addition, installation of a BACnet-compatible Tekmar snowmelt controller, integration of all new and existing BACnet devices into a unified front-end, replacement of all space temperature, CO2, and duct pressure sensors, addition of mixed air and discharge air sensors where indicated, calibration and Test & Balance coordination for all VAV boxes, and addition of fan status monitoring to all BAS-controlled exhaust fans. The system must comply with BACnet standards and be fully web-accessible without proprietary software. Bidders must provide pricing for all bid categories, list at least three comparable projects, provide a list of subcontractors with defined responsibilities, submit required proof of insurance, and include copies of required licenses for all involved parties. Bidders must be factory-authorized integrators, have a service office within 75 miles, provide remote diagnostic capability, and be responsible for Test and Balance services for VAV calibration. All deviations from specifications must be noted. The contractor shall provide a three-year warranty for controllers, a one-year warranty for peripheral devices and workmanship, 24-hour warranty service response, eight hours of on-site operator training, system documentation and backup files, and complete system calibration and acceptance testing. Progressive payments will be based on completed work or materials stored onsite, with retainage until final acceptance. The Owner reserves the right to reject any or all bids and to request clarifications or further documentation as needed. Question Deadline 03/09/2026 at 12:00 PM ET Mark Sape, Phone: (231) 547-8103, Email: msape@rayder.net

Award

Educational

$177,655.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

June 1, 2026

Project location map

5200 Marion Center Rd, Charlevoix, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.