BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a mixed-use development in Grafton, Wisconsin. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of April 15, 2026 project was awarded to Dorner Inc., awarded amount is $4,882,117.91. All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. All requests for interpretation must be received at least five business days prior to the day set for receiving Bids. The Project includes the following approximate quantities of Work: 5,300 linear feet (LF) of sanitary force main; 2,380 LF of 8-inch (IN) to 15-IN sanitary sewer; 3,170 LF of 6-IN to 8-IN water main; 2,120 LF of 12-IN to 36-IN storm sewer; 3,700 LF of roadway reconstruction with full or spot curb and gutter replacement; 11,200 square yards (SY) of mill and overlay; and 800 SY of sidewalk and curb ramp replacements. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 5% of the Bidder's maximum Bid price. OWNER reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 120 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. Any Contract or Contracts to be awarded are expected to be funded with assistance from the Wisconsin Department of Natural Resources Clean Water Fund Program and is subject to all applicable State and Federal laws and regulations. Disadvantaged Business Enterprises (DBEs), including Women's and Minority owned businesses, are encouraged to submit Bids for this Project. Bidders must demonstrate positive efforts to utilize DBEs. Failure to comply could result in disqualification of Bidder and termination of financial assistance or other sanctions. The successful Bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Related Acts. All iron, steel, manufactured products, and construction materials shall also be produced in the United States and comply with the American Iron and Steel requirements. For further requirements regarding Bid submittal, qualifications, procedures, and Contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Award

Water / Sewer

$4,882,118.00

Public - City

Paving, Site Work

100

14

8

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
177
Bidding Soon
2,379
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2026

August 28, 2026

Project location map

9th Ave, Grafton, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.