Site work for a water / sewer project in Lake Tomahawk, Wisconsin. Completed plans call for site work for a water / sewer project.
Construction of a new brick-and-block chemical and electrical building to house a chemical phosphorus removal system, soda ash slurry system, and all electrical and controls equipment for the WWTF site (new and relocated existing controls). Two new ancillary below grade structures are also included: an influent dosing structure and a chemical dosing manhole. The work also includes yard piping construction and modifications, demolition and modifications to existing site electrical infrastructure, and integration of the new structures into the existing WWTF process flow and utilities. Work within two existing buildings will largely consist of electrical demolition, relocation, and modifications along with plumbing modifications. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with the wage rate scale established by Federal Davis Bacon Wage Rates. Project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), Women’s Business Enterprises (WBEs), and Small Businesses in Rural Areas (SBRAs) are encouraged to submit bid proposals. A municipality, in awarding prime contracts, and primary contractor, in awarding subcontracts, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE WBE utilization. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the 'Use of American Iron and Steel' provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. Owner reserves the right to waive any informalities or to reject any or all bids. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. MSA Professional Services 1835 N Stevens Street Rhinelander, WI 54501 Shane Dennis, P.E.. Question Deadline 03/19/2026
Bid Results
Water / Sewer
$2,177,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2026
November 26, 2026
7848 Pine Rd, Lake Tomahawk, WI
Related To This Project
Lake Tomahawk, WI
Bid Date: May 12 2026
Lake Tomahawk, WI
--
Lake Tomahawk, WI
Bid Date: May 22 2025
Lake Tomahawk, WI
Bid Date: Oct 15 2024
Lake Tomahawk, WI
Bid Date: Jul 30 2024
Lake Tomahawk, WI
Bid Date: Apr 15 2024
Lake Tomahawk, WI
Bid Date: Mar 01 2024
Lake Tomahawk, WI
Bid Date: Dec 05 2023
Lake Tomahawk, WI
Bid Date: Dec 19 2023
Lake Tomahawk, WI
Bid Date: Feb 11 2022
Lake Tomahawk, WI
Bid Date: Sep 15 2023
Lake Tomahawk, WI
Bid Date: Jun 13 2023
Lake Tomahawk, WI
Bid Date: Jun 13 2023
Lake Tomahawk, WI
Bid Date: May 09 2023
Lake Tomahawk, WI
Bid Date: Apr 12 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.