BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a road / highway in Walker, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000414909 Bid Intent Optional Bid Intent Deadline 03/17/2026 08:30 AM EDT Question Deadline 03/10/2026 at 9:00 AM ET Questions are submitted online Yes .If you have questions, please reach out to purchasing@kentcountyroads.net. General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The Board reserves the right to reject any or all bids, to waive any irregularities in the bidding process, and to accept the bid or bids deemed, in its sole discretion, to be most advantageous and in the best interest of the County The Mill and Fill section between Cascade Road and Segwun Ave is anticipated to be a full depth mill and fill. We are proposing 5" of HMA to be placed back, however some areas may exceed 5" in depth. Work with Engineer and on-site inspector to determine if all of the existing pavement is to be removed in these areas.

Award

Roads / Highways

$1,674,542.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
83
Bidding Soon
1,255
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

April 1, 2026

Project location map

Cascade Road to Segwun Avenue, Walker, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.