Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 17, 2026 at 8:00 PM
Updated March 18, 2026
Site work for a development in Bountiful, Utah. Completed plans call for site work for a development.
Questions Due Date: Mar 10th 2026, 6:00 PM MDT For questions regarding this project, please contact Todd Christensen of the Bountiful City Engineering Department at (801) 298-6125, or via email at toddc@bountifulutah.gov. This contract includes providing coordination, inspection, quality control, and record keeping services for trail construction, as Bountiful City intends to hire contractors to construct about 3 miles of trails in the Mueller Park and Holbrook areas near Bountiful City. The trails are planned to be built primarily on property managed by US Forest Service, with a small portion on property owned by Bountiful City. These singletrack trails for multiple user groups are part of an overall trails network. The trails professional for the project must be independent (not under contract with Bountiful City for trails construction) and qualified to perform these services. The 2026 Big Rock Hiking Trail Project includes about 1.1 miles of trail, planned and flagged by IMBA with some re-flagging by Creative Trails. The lower segment of this trail is planned to cross very steep terrain and include significant rock retaining work. The budget to construct this trail is $107,000. The 2026 Holbrook Trails Project includes two trails master planned by IMBA and flagged by Creative Trails. One of these two trails is planned to be built in 2026: trail 501 which is anticipated to be about 1.8 miles long. The budget to construct this trail is $120,000.
Post-Bid
Conservation and Development
$227,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 17, 2026
June 1, 2026
Multiple Locations, Bountiful, UT
Related To This Project
Bountiful, UT
Bid Date: Mar 26 2026
Bountiful, UT
Bid Date: May 12 2026
Bountiful, UT
Bid Date: May 12 2026
Bountiful, UT
Bid Date: Mar 03 2026
Bountiful, UT
Bid Date: Mar 03 2026
Bountiful, UT
Bid Date: Feb 18 2026
Bountiful, UT
Bid Date: Feb 18 2026
Bountiful, UT
Bid Date: Feb 10 2026
Bountiful, UT
Bid Date: Jul 10 2025
Bountiful, UT
Bid Date: Jun 19 2025
Bountiful, UT
Bid Date: May 22 2025
Bountiful, UT
Bid Date: Apr 01 2025
Bountiful, UT
Bid Date: Apr 01 2025
Bountiful, UT
Bid Date: Mar 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
