Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 27, 2026 at 8:00 PM
Updated May 21, 2026
Site work, paving, outdoor lighting and new construction of a mixed-use development in Aynor, South Carolina. Completed plans call for the construction of a 23,860-square-foot, one-story above grade fitness / recreation center; for site work for a fitness / recreation center; playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
https://www.facebook.com/horrycountygov/posts/a-new-center-of-play-is-on-the-way-to-western-horry-countyjoin-us-as-we-break-gr/1393921726102536/ A new center of play is on the way to western Horry County! Join us as we break ground on the future Michael Morris Graham Recreation Center at 9:30 a.m. on Wednesday, April 22, 2026. · MICHAEL MORRIS GRAHAM RECREATION CENTER ?? Join us for the groundbreaking ceremony of the Michael Morris Graham Recreation Center at 9:30 a.m. on Wednesday, April 22, 2026. The new complex will feature an indoor gym, running track, outdoor pickleball and basketball courts, multi-use fields, walking trail and more. Our team is excited to bring a new center of play to life in western Horry County! ___________________________________________________________________________________ Reference Number 0000414848 MIchael Morris Graham Park Rec Center Build . Piggyback Contract No The Work includes: A new single story building of approximately 22,700 square feet +/- with concrete spread footing foundation, slab on grade floors, load bearing exterior and interior masonry walls, exterior split face CMU, brick and EIFS veneer, steel joists roof framing, built-up and standing seam metal roofs, gymnasium equipment and furnishings, carpet, tile and resilient floor finishes, sports flooring for gymnasium, exercise rooms and running track. A new Concession / Restroom Building of approximately 1,160 ESF. Additionally, the project includes site development which consists of multi-purpose/football fields, one of which will be an "enhanced" field with bleachers on one side and potentially field lighting. Outdoor pickleball and basketball courts, walking trails, parking, drives, walks, storm water facilities, relocation of the existing playground, and additional site related development. The scope of work includes plumbing, mechanical, automatic fire protection system sprinkler, electrical and associated site work. General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required - License Required Question Deadline 03/25/2026 at 2:00 PM ET Questions are submitted online Yes Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Each bid must be accompanied by a bid guarantee of not less than FIVE PERCENT (5%) of the base bid, which must be a bid bond, issued by a bonding company and have the required Power of Attorney Form. The successful bidder will be required to furnish Performance Bond and Labor & Material Payment Bond, each in the full amount of the contract sum, issued by a bonding company licensed to do business in South Carolina. Owner reserves the right to reject any or all bids or certain portions of a bid as stipulated in the Form of Proposal, and to waive any formalities and technicalities in bidding, and to award the job in the best interest of the Owner. No bid shall be withdrawn for a period of sixty (60) days from the opening date.
Award
Fitness / Rec Centers
$13,990,000.00
Public - County
New Construction, Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
May 4, 2026
1253 Vereen Rd, Aynor, SC
Related To This Project
Aynor, SC
Bid Date: May 04 2026
Aynor, SC
Bid Date: Aug 07 2025
Aynor, SC
Bid Date: May 09 2025
Aynor, SC
Bid Date: Aug 21 2024
Aynor, SC
Bid Date: Jul 24 2024
Aynor, SC
Bid Date: Jun 20 2024
Aynor, SC
Bid Date: Jun 11 2024
Aynor, SC
Bid Date: Aug 17 2020
Aynor, SC
Bid Date: Feb 15 2024
Aynor, SC
Bid Date: Sep 27 2023
Aynor, SC
Bid Date: Aug 17 2023
Aynor, SC
Bid Date: Aug 17 2023
Aynor, SC
Bid Date: Jul 26 2023
Aynor, SC
Bid Date: May 04 2023
Aynor, SC
Bid Date: May 25 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
