Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 14, 2026 at 8:00 PM
Updated March 15, 2026
Renovation of a municipal facility in Las Vegas, Nevada. Completed plans call for the renovation of a municipal facility.
The work consists of all labor, materials, utilities, permits, devices, systems and equipment necessary to demo one (1) existing 250mbh Lochinvar atmospheric boiler and (1) existing boiler circulation inline pump, air separator, expansion tank, piping, supports, devices and other associated systems per project drawings within this set of plans and manuals, and replace with (2) 500mbh non condensing (near condensing) boilers, working in unison and providing redundancy, and (2) boiler circulation pump, piping, supports, devices and other associated systems as required for successful installation and operation of the systems. Question Deadline 03/17/2026 at 5:30 PM PT *prebid info : If your firm is unfamiliar with the County Bid Submittal procedures and would like to obtain training on the submittal process for this Bid, please contact Geraldine Cruz, Purchasing Analyst, at (702) 455-6277 no later than MONDAY, MARCH 9, 2026, and a training session will be provided immediately following the pre-bid conference ESTIMATED COST: $426,774.20 - $449,236.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 1. THE "PROJECT" OF WHICH THE "WORK" OF THE CONTRACT IS PART TITLED: PINTO CAMPUS IT BOILER REPLACEMENT LOCATED AT 1670 PINTO LANE LAS VEGAS NV 89106. THE "WORK" IS DESCRIBED IN THE PROJECT DRAWINGS AND SPECIFICATIONS DIVISION 1 THROUGH DIVISION 48 OF THE PROJECT MANUAL. 2. "WORK" OF THIS PROJECT INCLUDES BUT IT IS NOT LIMITED TO DIVISIONS 0, 1, 2, 3, 4, 22, 23 & 26. 3. THE WORK CONSISTS OF ALL LABOR, MATERIALS, UTILITIES, PERMITS, DEVICES, SYSTEMS AND EQUIPMENT NECESSARY TO DEMO ONE (1) EXISTING 250MBH LOCHINVAR ATMOSPHERIC BOILER AND (1) EXISTING BOILER CIRCULATION INLINE PUMP, AIR SEPARATOR, EXPANSION TANK, PIPING, SUPPORTS, DEVICES AND OTHER ASSOCIATED SYSTEMS PER PROJECT DRAWINGS WITHIN THIS SET OF PLANS AND MANUALS, AND REPLACE WITH (2) 500MBH NON CONDENSING (NEAR CONDENSING) BOILERS, WORKING IN UNISON AND PROVIDING REDUNDANCY, AND (2) BOILER CIRCULATION PUMP, PIPING, SUPPORTS, DEVICES AND OTHER ASSOCIATED SYSTEMS AS REQUIRED FOR SUCCESSFUL INSTALLATION AND OPERATION OF THE SYSTEMS. 4. "WORK" AT BOILER ROOM AND ADJOINING AIR HANDLER ROOM, BOTH ARE REFERRED AS "MECHANICAL ROOMS" ALSO CONSIST OF PIPING/FITTINGS, HYDRONIC VALVES AND APPURTENANCES, CONTROL VALVES, PIPING SUPPORTS, EQUIPMENT PADS, NATURAL GAS PIPING, FLOOR DRAIN AND FLOOR SINK AND ASSOCIATED PIPING, FLUE AND COMBUSTION PIPING AND ELECTRICAL POWER AS NECESSARY FOR REMOVAL OF EXISTING AND CONNECTION TO THE NEW EQUIPMENT AND SYSTEMS. 5. NATURAL GAS SERVICE WORK INCLUDES REMOVAL OF EXISTING METER, REGULATOR AND PIPING AND INSTALLATION OF (1) NATURAL-GAS METER, REGULATOR AND ASSOCIATED PIPING AND COORDINATION WITH SOUTHWEST GAS COMPANY. 6. ROOFING WORK INCLUDES PATCHING EXISTING FLUE PIPE ROOF OPENING AND NEW ROOFING FOR (2) BOILER FLUE VENT PIPES. 7. STRUCTURAL CONCRETE WORK INCLUDES EXTENDING OF EXISTING 4" CONCRETE PAD INSIDE THE MECHANICAL ROOM TO ACCOMMODATE FOR INSTALLATION OF NEW BOILERS. PROVIDING WALL OPENINGS FOR COMBUSTION AIR LOUVERS. 8. "WORK" INCLUDES TESTING, ADJUSTING AND BALANCING OF THE ENTIRE HEATING HOT WATER HYDRONIC SYSTEM. 9. SYSTEM COMMISSIONING TO BE PROVIDED PER REQUIREMENTS OF CONTRACT DOCUMENTS. 10."WORK" INCLUDES JOHNSON CONTROLS "JCI" TO REMOVE EXISTING CONTROLS AND CONNECT NEW SYSTEM AND INTEGRATE TO EXISTING CONTROL SYSTEMS. CONTRACTOR TO CONTRACT JCI FOR NEW CONTROLS AND SEQUENCING SETUP, AND INTEGRATION OF THE NEW AND EXISTING BACNET CONTROL SYSTEMS. 11.WORK SEQUENCE: "WORK" TO BE PERFORMED DURING THE WARM MONTHS OF A YEAR WHEN SPACE HEATING WILL NOT BE REQUIRED. 12.REFER TO DIVISION 01 SPECIFICATION SECTION 01 11 00 SUMMARY OF WORK FOR ADDITIONAL REQUIREMENTS. pn-18-43135-49
Sub-Bidding
Municipal
$449,236.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2026
May 4, 2026
1670 Pinto Ln, Las Vegas, NV
Related To This Project
Las Vegas, NV
--
Las Vegas, NV
--
Las Vegas, NV
--
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Apr 02 2026
Las Vegas, NV
--
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Apr 13 2026
Las Vegas, NV
Bid Date: Apr 15 2019
Las Vegas, NV
Bid Date: Feb 21 2019
Las Vegas, NV
Bid Date: Apr 11 2019
Las Vegas, NV
Bid Date: Nov 15 2018
Las Vegas, NV
Bid Date: May 30 2019
Las Vegas, NV
Bid Date: Jun 14 2021
Las Vegas, NV
Bid Date: Aug 17 2021
