BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2026 at 8:00 PM

Updated March 27, 2026

Site work and paving for a mixed-use development in Naperville, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The scope of work includes pavement patching, crack filling, application of asphalt emulsion sealcoating, and pavement markings at multiple locations throughout the Naperville Park District for a complete project as shown in the Drawings and Specifications. If a bid is accepted, a Surety Bond (aka Performance and Labor & Material Payment Bond), payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount will be required prior to beginning construction. A Surety Bond, payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount is required by Statute prior to beginning construction on all projects where the Contract Sum is $150,000 or more and may be required for projects $150,000 or less at the discretion of the Naperville Park District. Such bonds shall include the provision guaranteeing the faithful performance of the Prevailing Wage Act. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency. All questions concerning this project or those concerning bidding requirements should be directed to Mike Piszynski in writing to mpiszynski@napervilleparks.org. Questions will be received in writing only through March 13, 2026. The Park District reserves the right to reject any non-responsive or non-responsible Bids or to reject all bids and waive any informality or technicality in any Bid in the interest of the Park District. ******THE PLANS AND SPECIFICATIONS ON FILE ARE FOR "REVIEW ONLY". IN ORDER TO SUBMIT AN ELIGIBLE BID, CONTRACTORS ARE REQUIRED TO GET A COPY OF THE PLANS AND SPECIFICATIONS FROM NAPERVILLE PARK DISTRICT.****** Project Locations: Central Park Trail 104 E. Benton Avenue Commissioners Park Parking 3704 111th Street Country Lakes Park Parking & Trail 736 Genesee Road Knoch Park Parking 724 S. West Street DuPage River Trail Trail Villa Ave. --> Gartner Rd.

Bid Results

Roads / Highways

$57,921.00

Public - City

Paving, Site Work

8

12

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
3
Bidding Soon
2,340
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2026

April 2, 2026

Project location map

Multiple Locations, Naperville, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.