BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 5, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Naperville, Illinois. Completed plans call for site work for a water / sewer project.

The work consists of the complete rehabilitation of existing sanitary sewer pipelines. This includes the installation of either glass Reinforced Plastic (GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP) cured with ultraviolet light, or resin-saturated felt CIPP lining cured with steam or hot water. Additionally, the scope of work includes the pressure test and grouting of lateral connections six feet (6') upstream after CIPP lining installation. Bidders are advised to review the full solicitation document for complete details. CIPP Lining for 8" Sanitary Sewer CIPP Lining for 10" Sanitary Sewer CIPP Lining for 15" Sanitary Sewer CIPP Lining for 18" Sanitary Sewer Reinstate Service Lateral in 8" Main Reinstate Service Lateral in 10" Main Reinstate Service Lateral in 15" Main The City of Naperville is accepting sealed bids from qualified vendors to supply labor, equipment, supplies, and materials associated with the Small Diameter Sanitary Sewer Main Cured-In-Place Pipelining Rehabilitation. The work generally includes but not limited to: installation of either glass reinforced plastic (GRP) or cured-in-place thermosetting resin pipe (CIPP) cured with ultraviolet lights. As well as pressure test and grouting of lateral connections six feet (6') upstream (post CIPP lining). The estimated sanitary sewer to be lined is 14,502 linear feet with an additional 36 linear feet of drop assembly pipe. The estimated total quantity of sanitary sewer laterals to be tested and sealed is 176. All laterals are six-inch (6") and mainline pipe sizes include eight-inch (8"), ten-inch (10"), fifteen-inch (15") diameter, and eighteen-inch (18") diameter. Pipe material is vitrified clay pipe, reinforced plastic pipe (Truss), and ductile iron pipe. Some segments of pipe may require heavy cleaning prior to lining. Question Deadline 03/24/2026 at 12:00 PM CT Question Response Deadline: March 30, 2026, 12:00pm All work within the scope of this bid shall be completed no later than December 1, 2026

Award

Water / Sewer

$824,347.00

Public - City

Site Work

10

9

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
516
Active Projects
343
Bidding Soon
4,444
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

June 8, 2026

Project location map

To be determined, Naperville, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.