BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2026 at 8:00 PM

Updated March 27, 2026

Site work for a transportation facility in Killdeer, North Dakota. Completed plans call for site work for a transportation facility.

DESCRIPTION OF WORK: The work includes the construction of approximately: COMMON EXCAVATION 500 CU YD #6 AWG, 600V CABLE, INSTALLED IN DUCT BANK OR CONDUIT 6100 LIN FT GRANULAR BORROW 840 CU YD 2-INCH SCH. 40 PVC OR HDPE, INCLUDING TRENCHING 6100 LIN FT SITE RESTORATION 1 LS 2 CELL DUCT BANK, INCLUDING TRENCH, DIR. BORE 190 LIN FT #6 AWG, 5KV CABLE INSTALLED IN DUCT BANK OR CONDUIT 11,200 LIN FT L-867 ELECTRICAL HANDHOLE 15 EACH #8 AWG, 5KV CABLE INSTALLED IN DUCT BANK OR CONDUIT 316 LIN FT LED RUNWAY END IDENTIFIER LIGHTING (REIL) SYSTEM 2 SET #12 AWG, 600 V CABLE, INSTALLED IN DUCT BANK OR CONDUIT 640 LIN FT LED PRECISION APPROACH PATH INDICATOR (PAPI) SYSTEM 2 SET together with numerous related items of work, all in accordance with Plans and Specifications

Post-Bid

Transportation Terminals

$750,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
0
Bidding Soon
83
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2026

April 24, 2026

Project location map

To Be Determined, Killdeer, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.