BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a civil project in Murrayville, Georgia. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

**As of April 8, 2026 this project has not yet been awarded. A timeline for the award has not yet been established.** The scope and procedure for this project shall consist of installing 3 lines of 48" HDPE pipe, each being 60 feet long and grading on Wahoo Creek Road. It will also include applying asphalt millings to the road way for a distance up to 325' x 16' wide and being 2 feet thick where it crosses the pipe. Asphalt millings will be furnished by Lumpkin County and shall be loaded and hauled from the Lumpkin County Shop on Red Oak Flats Road to the project by the successful contractor. All work shall be done in accordance with the 2021 State of Georgia Standard Specifications any supplemental specifications contained in this document. Question Deadline 03/24/2026 at 12:00 PM ET The inquiries must be directed to: Ryan McDuffie, Purchasing Agent Lumpkin County Board of Commissioners 99 Courthouse Hill, Suite D Dahlonega, GA 30533 ryan.mcduffie@lumpkincounty.gov. March 26, 2026 at 5:00 pm .Answers to written questions posted to website at electronically. Bid Bonds 5% of total bid amount Performance and Payment Bonds 100% of total contract price (required of awarded vendor only) The contract between the County and the Contractor shall become effective upon signing and shall be completed no later than 90 calendar days from the day the Notice to Proceed is issued. Lumpkin County reserves the right to terminate the contract at any time if successful bidder fails to meet requirements stated in this bid. Bids May Not Be Withdrawn for Ninety (90) Days After the Time and Date Set for Closing, Except as Allowed by Ocga. Lumpkin County Reserves the Right to Reject Any And All Bids and to Waive Any Technicalities.

Bid Results

Water / Sewer

$65,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
316
Active Projects
136
Bidding Soon
2,366
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2026

May 4, 2026

Project location map

Wahoo Creek Rd, Murrayville, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.