Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 6, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a power facility in Norwich, Connecticut. Completed plans call for the renovation of a power facility.
Replacement of windows at the Occum Dam Hydro Facility, Connecticut. 1. Mobilization and Site Coordination o Coordination with facility personnel for access and scheduling. o Protection of adjacent interior spaces, exterior areas, and equipment. 2. Asbestos Abatement o Removal of asbestos-containing glazing materials by properly licensed personnel. o Full compliance with OSHA, EPA, and Connecticut DEEP requirements. o Containment, handling, transport, and disposal of asbestos-containing materials at an approved facility. o Provision of waste manifests and disposal documentation. 3. Demolition and Removal o Removal of existing window units, frames, glazing, and associated components as required. o Protection of existing masonry and structural elements. 4. Window Lintels o Clean, scrape and paint window lintels 5. Window Furnishing o Furnish new heavy-duty industrial windows constructed of fiberglass, metal, or similar durable material. o Windows are not required to meet historic preservation standards. o Window pane quantity and layout shall match existing conditions as shown in the attached interior and exterior photographs. o Pane layout to be achieved using exterior grids or internalsimulated divided lites. 6. Window Installation o Install windows plumb, level, and square within existing openings. o Proper flashing, sealing, and weatherproofing of all window perimeters. o Installation shall be suitable for an industrial hydroelectric facility environment. 7. Finishing and Cleanup o Patch and repair disturbed adjacent surfaces as required for a complete installation. o Final cleaning of glass surfaces. o Removal of all construction debris from the site. 8. Quantities and Field Verification o Window quantities, sizes, and pane configurations are based on existing conditions and the attached photographs. o Contractor shall verify all field dimensions prior to fabrication. o Lump Sum price includes all windows shown in the attached photographs
Bid Results
Hydroelectric Power Generation
$96,870.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
