BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Lakewood, Ohio. Completed plans call for site work for a sidewalk / parking lot; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of May 06, 2026 project was awarded to Perk Company, Inc, awarded amount is $1,117,466.50 The work to be accomplished on Quail Street from Madison Avenue to Plover Street includes planing of the existing asphalt concrete pavement, full depth pavement repairs as needed, resurfacing with asphalt concrete, erosion control, pavement restriping in-kind, installation of colorized and broom-finished concrete crosswalk, adjustments of manholes, catchbasins, monument boxes and valve boxes to grade, repair of catchbasins and manholes, and other appurtenances. Curbs, driveway aprons, and curb underdrains will be replaced as directed. Madison Avenue West 117th Street intersection is a full-depth concrete removal and replacement, commercial driveway replacement, removal of existing brick treelawn and replacement with colorized stamped concrete, installation of new tree pits with CU structural soil, portions of concrete sidewalk replacement, installation of colorized and broom-finished crosswalk, erosion control, pavement restriping in-kind, adjustments of manholes, catch basins, monument boxes and valve boxes to grade, tuck point repair of catch basins and manholes, and other appurtenances, as shown on the project plans. Maintenance of Traffic plan will be the Contractor's responsibility to develop and implement. Minimally, one lane of travel in all directions is required. The Contractor will be required to obtain approval of the MOT and sequence plan from the Cities of Lakewood and Cleveland and will need to coordinate. Any LEOs required will be the responsibility of the Contractor. Coordination with Greater Cleveland Regional Transit Authority (GCRTA) is the Contractor's responsibility. At the Edgewater Drive West 117th Street intersection, work includes planing the top layer of concrete with asphalt replacement atop, installation of colorized and broom-finished concrete crosswalk, erosion control, pavement restriping in-kind, treelawn planter box improvements, adjustments of manholes, catch basins, monument boxes and valve boxes to grade, repair of catch basins and manholes, and other appurtenances, as shown on the project plans. Maintenance of Traffic plan will be the Contractor's responsibility to develop and implement. Minimally, one lane of travel in all directions is required. The Contractor will be required to obtain approval of the MOT and sequence plan from the Cities of Lakewood and Cleveland and will need to coordinate. Any LEOs required will be the responsibility of the Contractor. Coordination with Greater Cleveland Regional Transit Authority (GCRTA) is the Contractor's responsibility. Questions can be emailed to Mark Papke, PE, CPESC at Mark.papke@lakewoodoh.gov and copy to Josh Conrad at josh.conrad@lakewoodoh.gov no later than 3:00 P.M. EDT March 31, 2026

Award

Roads / Highways

$1,117,467.00

Public - City

Paving, Site Work

21

15

6

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

May 8, 2026

Project location map

Multiple Locations, Lakewood, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.