Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 6, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a mixed-use development in Lakewood, Ohio. Completed plans call for site work for a sidewalk / parking lot; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of May 06, 2026 project was awarded to Perk Company, Inc, awarded amount is $1,117,466.50 The work to be accomplished on Quail Street from Madison Avenue to Plover Street includes planing of the existing asphalt concrete pavement, full depth pavement repairs as needed, resurfacing with asphalt concrete, erosion control, pavement restriping in-kind, installation of colorized and broom-finished concrete crosswalk, adjustments of manholes, catchbasins, monument boxes and valve boxes to grade, repair of catchbasins and manholes, and other appurtenances. Curbs, driveway aprons, and curb underdrains will be replaced as directed. Madison Avenue West 117th Street intersection is a full-depth concrete removal and replacement, commercial driveway replacement, removal of existing brick treelawn and replacement with colorized stamped concrete, installation of new tree pits with CU structural soil, portions of concrete sidewalk replacement, installation of colorized and broom-finished crosswalk, erosion control, pavement restriping in-kind, adjustments of manholes, catch basins, monument boxes and valve boxes to grade, tuck point repair of catch basins and manholes, and other appurtenances, as shown on the project plans. Maintenance of Traffic plan will be the Contractor's responsibility to develop and implement. Minimally, one lane of travel in all directions is required. The Contractor will be required to obtain approval of the MOT and sequence plan from the Cities of Lakewood and Cleveland and will need to coordinate. Any LEOs required will be the responsibility of the Contractor. Coordination with Greater Cleveland Regional Transit Authority (GCRTA) is the Contractor's responsibility. At the Edgewater Drive West 117th Street intersection, work includes planing the top layer of concrete with asphalt replacement atop, installation of colorized and broom-finished concrete crosswalk, erosion control, pavement restriping in-kind, treelawn planter box improvements, adjustments of manholes, catch basins, monument boxes and valve boxes to grade, repair of catch basins and manholes, and other appurtenances, as shown on the project plans. Maintenance of Traffic plan will be the Contractor's responsibility to develop and implement. Minimally, one lane of travel in all directions is required. The Contractor will be required to obtain approval of the MOT and sequence plan from the Cities of Lakewood and Cleveland and will need to coordinate. Any LEOs required will be the responsibility of the Contractor. Coordination with Greater Cleveland Regional Transit Authority (GCRTA) is the Contractor's responsibility. Questions can be emailed to Mark Papke, PE, CPESC at Mark.papke@lakewoodoh.gov and copy to Josh Conrad at josh.conrad@lakewoodoh.gov no later than 3:00 P.M. EDT March 31, 2026
Award
Roads / Highways
$1,117,467.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
