BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 3, 2026 at 8:00 PM

Updated July 9, 2026

Site work for a water / sewer project in Bremerton, Washington. Conceptual plans call for site work for a water / sewer project.

Provide design and construction services for waterfront and marine mega-projects under a Multiple Award Construction Contract supporting the Shipyard Infrastructure Optimization Program, including design-build and design-bid-build efforts. Work primarily involves construction of a new Multi-Mission Dry Dock within the existing Dry Dock 3 footprint at Naval Base Kitsap Bremerton, including dry dock drainage, dewatering and flooding systems, caisson fabrication and installation, roadways and rail networks, portal crane tracks, access and egress features, mechanical, electrical and communication systems, support buildings, utility routing tunnels, and associated demolition of existing facilities and utilities. Efforts also include dredging, construction of cofferdams, upland shoring and ground improvements, excavation, pressure relief systems, quay walls, pump wells, installation of utilities and infrastructure, fabrication and installation of fendering systems, paving, crane rail installation, testing and commissioning, and procurement and installation of process equipment. Location: Naval Base Kitsap Bremerton, 120 South Dewey Street, Bremerton, WA 98314 The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Military

$10,000,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
312
Active Projects
6
Bidding Soon
2,136
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

Project location map

Multiple Locations, Bremerton, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.