BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 1, 2026 at 8:00 PM

Updated April 2, 2026

Site work for a mixed-use development in Pacific Grove, California. Completed plans call for site work for a educational facility; and playground / park / athletic field.

The project consists of reworking the rear play-yard site work at Robert H Down Elementary School, including but not limited to: concrete pavement and AC replacement/repaving, exterior stairs and railing replacement, new slope walkways, fencing and gates, sports play equipment and game striping, trash enclosure, and ball wall. Bids must be submitted in person. All questions about the project should be submitted online by email. The successful bidder must furnish a Payment (Labor and Material) Bond and a Faithful Performance Bond, each in the amount of one hundred percent (100%) of the Contract Sum. Bidders must be licensed to do business in the State of California with a Class "B" license, which must be maintained in good standing through Contract Completion and all applicable warranty periods. This is a Prevailing Wage project. DSA FILE No. 27-37 DSA APPLICATION No. 01-122778 OPSC PROJECT TRACKING No. 66134-35 Bid Questions Due 2:00 pm on March 17, 2026 PGUSD will not respond to any bidder inquiries or clarification requests, unless such inquiries or clarification requests are submitted timely to the following: jill@ausonio.com. Purpose of Bid: 1. The purpose of this bid is to solicit offers from qualified General Contractors to perform Site Improvements at Forest Grove Elementary School. Work shall include but not be limited to the following: a. Concrete pavement and AC replacement/repaving to meet ADA accessibility compliance. b. Exterior stairs and railing replacement to meet ADA accessibility compliance. c. New slope walkways to meet ADA accessibility compliance. d. Fencing and gates. e. New sports play equipment and game striping. f. Chain link fence and gate trash enclosure. g. Ball wall. 2. The Contractor shall be responsible for scheduling and coordinating the work with the MPC Staff, Representatives, and contractors on other MPC projects working concurrent with this project. Reference paragraph 1.04 of this section. 3. The work to be done includes all labor, tools and equipment necessary to furnish and install all materials and equipment shown on the drawings and described herein and to perform tests described herein, to provide complete and operating systems to the extent specified and shown on the drawings. The Contractor shall furnish all equipment, material and supplies, except where specifically noted as existing or supplied by the District.

Post-Bid

Educational

$1,385,000.00

Public - City

Site Work

36

20

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
89
Bidding Soon
929
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2026

May 26, 2026

Project location map

485 Pine Ave, Pacific Grove, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.