BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a civil project in Friendswood, Texas. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; and water / sewer project.

As of May 01, 2026, the project was awarded to Reytec Construction Resources, Inc., with an awarded amount of $8,629,733.50. The Project includes the replacement of a four-lane curb-and-gutter concrete roadway along Blackhawk Boulevard from FM 2351 to approximately 500 feet south of Pennystone Way and Thursa Lane to FM 528. This includes pavement, drainage (24" - 42" RCP and 5'x3' RCB), and 12" PVC water line at locations that is not PVC. The project also includes installation of a 24" transmission water main from FM 2351 to Edenvale Street. Offerors are responsible for downloading all required documents, plans, specifications, proposal forms, and addenda for submitting a proposal. Each proposal must be accompanied by the following: Competitive Sealed Proposal Form, relevant project experience within the past five years, proposed project approach, company organization chart including those working directly on this project, demonstrated ability to meet the project schedule, list of subcontractors and their qualifications and previous work experience, quality assurance and safety record, current project workload, certificate of insurance, Certificate of Interested Parties (Form 1295), statement of conflicts of interest, Conflict of Interest Questionnaire Form, and Government Verification Form. No proposal may be withdrawn or terminated for a period of ninety days subsequent to the proposal opening date without the consent of the City of Friendswood. All references to days refer to calendar days, unless otherwise stated. Question Deadline 03/20/2026 at 5:00 PM CT For all questions, legal, purchasing, technical and schedule please contact: Name: Jildardo Arias, PE, CFM, ENV SP Title: Director of Engineering Phone: (281) 993-3411 Email: engineering@friendswood.com

Award

Roads / Highways

$8,629,734.00

Public - City

Paving, Site Work

115

15

2

6

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
421
Active Projects
243
Bidding Soon
3,747
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

June 1, 2026

Project location map

Blackhawk Blvd, Friendswood, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.