BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 27, 2026 at 8:00 PM

Updated March 28, 2026

Site work and paving for a road / highway in Pine Township, Pennsylvania. Completed plans call for site work for a road / highway; and road / highway.

Question Deadline 03/20/2026 at 1:00 PM ET The person submitting the request shall be responsible for its prompt and actual delivery by on the date 5 days prior to the Bid Opening Date. Such requests shall be emailed to the TOWNSHIP Engineer, Art Gazdik at, artgazdik@groundworkcivil.net. The work shall consist of all labor, equipment, and materials necessary for the following Contracts; 2026 Road Improvement Project Contacts for Milling, Paving & Road Repairs (Contracts 26-01 & 26-02) These contracts include +/- 33,800 SY of milling and asphalt paving. All questions related to the project shall be addressed to Art Gazdik, Marshall Township Engineer at artgazdik@groundworkcivil.net. The work consists of all labor, equipment, and materials necessary for the following contracts: 2026 Road Improvement Project for Milling, Paving & Road Repairs (Contracts 26-01 & 26-02), which includes approximately 33,800 square yards of milling and asphalt paving; and Markman Park Road Phase 2, which includes Full Depth Reclamation Contract, asphalt paving, and associated items of work (approximately 18,600 square yards). Pennsylvania prevailing wages shall be paid on all contracts unless noted otherwise. Copies of drawings, specifications, instructions to bidders, general conditions, forms of proposals, and agreements may be directly purchased from Accu-Copy Reprographics and reviewed online. Performance and Labor and Material Payment Bonds, along with Public Liability and Property Damage Certificates of Insurance in the specified amounts, as well as Certificates of Workman's Compensation, must be filed with the executed Agreement. Proposals must be accompanied by a Certified Check or Bidder's Bond made to the order of the Municipality of Marshall Township in an amount equal to ten percent (10%) of the total amount of Contracts 26-01 & 26-02 and a separate bond for the Markman Park Project if bid. All proposals will remain firm for a period of sixty (60) days after the date of opening. The Board of Supervisors reserves the right to reject any or all proposals, or any part thereof, for any reason and reserves the right to waive any informality therein or to award the bid to the best responsible bidder.

Post-Bid

Roads / Highways

$700,000.00

Public - County

Paving, Site Work

3

9

2

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
329
Active Projects
176
Bidding Soon
2,938
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

May 30, 2026

Project location map

Multiple Locations, Pine Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.