Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 29, 2026 at 8:00 PM
Updated May 30, 2026
Renovation of a multi-residential development in Hialeah, Florida. Completed plans call for the renovation of a multi-residential development.
Sealed bids are requested for the Windows/Sliding Doors Replacement at Palm Centre, located at 60 E 3rd Street, Hialeah, FL 33010, under IFB#26-PC-001. Requirements include the submission of a 5% Bid Bond and a Consent of Surety (original from a surety company stating it will issue the necessary Performance and Payment Bonds if the bidder enters into a contract). Questions regarding bid documents, plans or specifications must be submitted in writing no later than, March 27, 2026. Attention: Miguel Hernandez, Development & Modernization Administrator 75 E. 6th Street, Hialeah, Fl. 33010 FAX # (305) 887-0997 Email: Miguel.Hernandez@hialeahhousing.org Contractor shall furnish a detailed schedule of work to be performed to the Hialeah Housing Authority once a Notice to Proceed has been issued. - Contractor shall be responsible to properly notify tenant within 48 hours of commencing any work. Such notification shall be made in writing and properly placed in front door of tenant. In addition, the Contractor shall send a copy of the notification to the HHA (Hialeah Housing Authority). - Upon commencing any work, Contractor will be responsible to visit the job site and become familiar with the existing conditions of the building, including, but not limited to access routes, parking, delivery, and storage areas. If any conditions deviate from the overall scope of work, Contractor shall notify the HHA in writing within 7 calendar days prior to commencing work. - Contractor shall provide all labor, materials, equipment and shop drawings required to perform and complete the scope of work as specified in a work like manner. -Contractor shall acquire all necessary permits, pay all permit fees and pass all required inspections from the Building Department and/or the Hialeah Housing Authority. - All construction to be in accordance with all applicable local codes and ordinances and the Florida Building Code. - Contractor shall be responsible to properly secure and protect the construction site from theft, vandalism and possible work-related damages to both existing structure and new construction. All path-up work performed shall match existing. - Contractors shall provide a safe working environment and comply, at a minimum, with OSHA standards to reduce and/or eliminate possible work-related accidents. - Contractor shall be responsible to protect and safe guard against damages to all vehicles and landscape. If special arrangements need to be made, the Contractor shall notify the H.H.A. in writing within 7 working days prior to commencing work. - Contractor is responsible to keep the job site free from accumulation of waste material and rubbish. Before the end of each working day, the Contractor shall inspect and clean-up any debris from the work area. Contractor shall remove and discard all construction debris from site at the completion of the scope of work specified and prior to the final inspection. - All work is subject to inspection by the Contracting Officer, Site Manager, Site Foreman, Maintenance Supervisor, and/or their appointee. They may require the Contractor to correct any defective workmanship or to replace any defective materials with no further cost to HHA, within 2-business days of notification of deficiency. -Contractor is responsible for replacing all existing Sliding Glass Doors with new Impact rated Resistant Sliding Glass Doors. Contractor shall verify number of Sliding Glass Doors to be replaced. Contractor shall verify with the City of Hialeah Building Department before submitting bids to ensure all requirements are met. This is highly recommended to avoid any complications.
Post-Bid
Multi-Residential
$500,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 6, 2026
May 6, 2026
60 E 3rd St, Hialeah, FL
Related To This Project
Hialeah, FL
Bid Date: Mar 13 2026
Hialeah, FL
--
Hialeah, FL
Bid Date: May 22 2026
Hialeah, FL
Bid Date: Jun 10 2026
Hialeah, FL
Bid Date: Jun 01 2026
Hialeah, FL
--
Hialeah, FL
--
Hialeah, FL
Bid Date: Apr 28 2026
Hialeah, FL
Bid Date: Mar 17 2026
Hialeah, FL
Bid Date: Mar 12 2026
Hialeah, FL
Bid Date: Feb 26 2026
Hialeah, FL
Bid Date: Jan 29 2026
Hialeah, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
