BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of a power facility in Saint Cloud, Minnesota. Completed plans call for the renovation of a power facility.

The contractor shall furnish all labor, materials, tools, and equipment required to remove and replace two 5000 KVA utility-grade transformers with two new 6000 KVA utility-grade transformers, and to remove and replace sixteen medium-voltage transformers ranging from 30 KVA to 750 KVA. Work includes providing and installing passive, anti-ram rated bollards compliant with ASTM F2656 crash rating requirements (minimum M30/P1 or as otherwise directed), placed at least three feet from transformer pads, spaced no more than five feet apart, and designed to be removable where located within electrical working clearances. Transformer pads shall be replaced where required with new pads constructed of 4000 psi concrete with reinforcement per project drawings. Work includes demolition and removal of existing transformers, concrete, and other items identified in the contract documents; removal and disposal of all equipment and materials not scheduled for reuse; and new construction within the substation area and at each transformer replacement location. No asbestos or lead is anticipated. Electrical, landscape, and site concrete trades are expected to be required for this project, and the contractor shall furnish all necessary equipment. All work shall be completed in accordance with the specifications and contract drawings. The magnitude of construction for this project is between $5,000,000.00 and $10,000,000.00. Questions of a technical nature and inquiries concerning this solicitation must be provided in writing and shall be submitted by the prospective offerors to the Contracting Officer, Dwayne Brauch. Questions shall be submitted only via email to: dwayne.brauch@va.gov. The Page 7 of 55 subject line must read: PN: 656-22-341 Conduct Substation Upgrade Questions. Telephone inquiries will not be accepted. Questions, inquiries, or such are due no later than April 27, 2026, at 10:00 AM (CT). No late questions will be accepted or answered after this deadline. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PID- 23.09

GC Bidding

Power Plant

$10,000,000.00

Public - Federal

Renovation

24

14

4

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
145
Bidding Soon
1,265
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2026

July 17, 2026

Project location map

4801 Veterans Dr, Saint Cloud, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.