BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a playground / park / athletic field in Fulton, Illinois. Completed plans call for site work for a playground / park / athletic field.

IDNR is seeking a Vendor to resurface a portion of the Great River Trail alongside the Thomson-Fulton Sand Prairie Nature Preserve Area, Whiteside County. Please refer to the Contract and Attachments for further details. The Parties to this contract are the State of Illinois acting through the undersigned Agency (collectively the State) and the Vendor. This contract, consisting of the signature page and numbered sections listed below and any attachments referenced in this contract, constitute the entire contract between the Parties concerning the subject matter of the contract, and in signing the contract, the Vendor affirms that the Certifications and Financial Disclosures and Conflicts of Interest attached hereto are true and accurate as of the date of the Vendor's execution of the contract. This contract supersedes all prior proposals, contracts and understandings between the Parties concerning the subject matter of the contract. This contract can be signed in multiple counterparts upon agreement of the Parties. 1. SCOPE OF WORK 1.1. OVERVIEW AND PURPOSE: The Department of Natural Resources (DNR) requires the resurfacing of a portion of the Great River Trail located alongside the Thomson-Fulton Sand Prairie Nature Preserve Area in Whiteside County. The purpose is to provide a safe trail system that serves the public. 1.2. SUPPLIES AND/OR SERVICES REQUIRED: 1.2.1. Vendor shall provide all equipment, labor, and materials necessary to complete the project. Refer to Attachment 1 - Project Plans for full project requirements. 1.2.2. Vendor shall perform work including but not limited to HMA patching, HMA leveling course (various locations), HMA resurfacing of the existing trail, and installation of bollards and stone boulders. Length of resurfacing is approximately 1 mile.

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - State/Provincial

Paving, Site Work

11

8

2

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
114
Bidding Soon
1,637
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

May 8, 2026

Project location map

22473 Railroad Lane, Fulton, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.