BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a bridge / tunnel in Canton, New York. Completed plans call for site work for a bridge / tunnel.

Sealed bids are requested for furnishing all labor and material necessary for Contract No. 1 - Restoration of Storm Damaged Bridge Sites. The contract involves the restoration of bridge locations damaged by a storm. Each bid must include security in an amount not less than five percent of the bid amount, following conditions detailed in the bid instructions. Sales and compensating use taxes should not be included for materials incorporated into the work that will be sold separately to the County before their incorporation. Bidders must observe specified employment conditions and minimum wage rates. Question Deadline 03/19/2026 Questions regarding the Contract Documents should be directed Bids@stlawco.gov within 7 days of bid opening. Stephanie Kerr Assisting Purchasing Agent 48 Court Street Canton, New York 13617 (315) 379-2207 skerr@stlawco.gov A. The work under Contract No.1 - Restoration of Storm Damaged Bridge Sites is located at three sites: Site 1: The bridge is located 250 feet north of the intersection of County Route 35 and Post Road in the Town of Potsdam. Site 2: The bridge is located 0.8 miles north of the intersection of County Route 55 and Cady Road in the Town of Lawrence. Site 3: The bridge is located 300 feet west of the intersection of Boyden and Farnes Road in the Town of Canton. 00 01 00.02 DESCRIPTION OF THE WORK A. The items of work under Contract No. 1 include, but are not necessarily limited to the following: Site 1: CR 35 over Grannis Brook - The project involves installing medium stone fill along the existing abutments, relocation of an upstream gravel bar and stream grading. Site 2: CR 55 over Allen Brook - The project involves installing medium stone fill along the existing abutments. Site 3: Boyden Road over Boyden Brook - The project involves drilling and pinning a concrete knee wall to bedrock along a portion of the begin abutment and wingwall.K

Bid Results

Bridges / Tunnels

$219,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
437
Active Projects
241
Bidding Soon
2,414
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

May 25, 2026

Project location map

Multiple Locations, Canton, NY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.