BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 9, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a multi-residential development in Trail, British Columbia. Completed plans call for the renovation of a 27,500-square-foot, three-story above grade, 35-unit multi-residential development.

Jubilee Place is a multi-unit residential building constructed in 1982 and is three storeys above grade, consisting of 35 apartments. All apartments are one-bedroom suites. The building contains a shared laundry room and mechanical rooms on each floor and has a total floor area of 27,500 ft2. Multi-Scope: Mechanical: MUA Upgrades: Replace central MUA with a dedicated outdoor air system equipped with a split air source heat pump including all associated electrical controls, piping insulation heat tracing, balancing, commissioning etc.; DHW Upgrades: Replace the DHW tanks electric heaters with a CO2 DHW heat pump including all associated electrical controls, piping insulation heat tracing, balancing, commissioning etc. Solar Installation of a rooftop solar PV array and associated electrical work, controls, roof supports. Roofing: Replace existing roofing including roof membrane, sheet metal, protection board, flashings, drains, exhaust ducts etc., and standard RCABC ten (10) year guarantee.

Post-Bid

Multi-Residential

$1,000,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
19
Bidding Soon
197
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

June 1, 2026

Project location map

1651 Bay Ave, Trail, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.