BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 13, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of an educational facility in Stamford, Connecticut. Completed plans call for the renovation of a educational facility.

The project requires installation of various control and isolation valves throughout the school. All terms and conditions, specifications, and bid forms are provided. Bids must be received online via ProcureWare. A bid deposit of 5% is required. Performance and payment bonds, each for 100% of the contract amount, are required of successful bidders. There is a mandatory pre-bid meeting at the main entrance of Turn of River Middle School. Questions must be submitted online via the Clarifications feature in ProcureWare. The scope of work is further detailed in the attached specifications and drawings. Question Deadline 03/19/2026 at 11:59 PM ET

Bid Results

Educational

$246,500.00

Public - City

Renovation

9

8

6

7

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,189
Active Projects
687
Bidding Soon
8,049
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2026

May 4, 2026

Project location map

117 Vine Rd, Stamford, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.