BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 5, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a mixed-use development in Hope, British Columbia. Completed plans call for site work for a bridge / tunnel; playground / park / athletic field; and for paving for a bridge / tunnel.

The Ministry of Environment and Parks is undertaking a program to complete flood remediation works at Coquihalla Canyon Park: 2021 Flood Remediation – Tunnel 5 Foundation Stabilization The work of this Contract consists of the supply and installation of materials, including all labour, equipment and tools related to flood remediation work, site preparation, all in accordance with the drawings and specifications, and for the prices tendered in the Schedule of Quantities and Unit Price Table. The Coquihalla Canyon Park: 2021 Flood Remediation – Tunnel 5 Foundation Stabilization works is generally described as follows: Tunnel 1 North Portal and Trail to Main Parking Lot: Replacement of existing gate and reuse of gate in Tunnel 3-4, or as directed by Ministry Representative. Installation of park benches. Tunnel 5: Supply and Install 20x 168 mm dia. micropile retaining wall 10 m deep over a length of 7.2 m with spacing at 380 mm; Supply and Install 18x 168 mm dia. 14 m deep micropiles in a grid formation ~7 m into the south portal; Supply and Install 6x steel W-beam pile caps, bolted to the tunnel liner footing. Restoring the work area/gravel pathway. Documents can be obtained from www.bcbid.gov.bc.ca Question Deadline 04/13/2026 at 2:00 PM PT

Post-Bid

Bridges / Tunnels

$250,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

June 1, 2026

Project location map

Coquihalla Canyon Park, Hope, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.