BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of a fire / police facility in Huntsville, Arkansas. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

The Huntsville Fire Department is soliciting sealed bids from qualified contractors for the design, manufacture, delivery, and installation of a three-story modular fire training burn tower located at Huntsville Fire Station #2, 378 Harmony Road, Huntsville, AR 72740. The facility shall support Class A live-fire training evolutions and comply with all requirements specified, including NFPA 1402 and NFPA 1403 compliance, modular construction utilizing factory-built components, and third-party certification for compliance and structural integrity. The structure will include a minimum of three stories with a clear ceiling height of at least nine feet per level, constructed with reinforced concrete, steel, or approved fire-resistant composite materials. Features shall include dedicated Class A burn rooms with sacrificial surfaces, configurable interior layouts, hose ports between floors, vertical ventilation openings, interior stairwells, and integrated training props such as a hallway burn prop, forcible entry prop, and vertical ventilation prop. Safety features include a standpipe system with hose connections on each level, adequate drainage, guardrails on elevated surfaces, and clearly marked emergency egress routes. The successful bidder must provide engineered drawings, NFPA compliance statements, third-party certification, installation manuals, maintenance schedules, and warranty information. Deliverables include completed fabrication, painting, transport, and setup of the fire training structure, an operations and safety manual, warranty information, as-built schematics, and anchoring details. Each bid must include a bid bond equal to five percent of the total bid amount as a guarantee not to withdraw the bid for 60 days. Proposals must be submitted in a sealed envelope clearly marked for the project.

Award

Fire / Police

$2,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
47
Bidding Soon
799
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

May 2, 2026

Project location map

378 Harmony Rd, Huntsville, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.