Published April 4, 2026 at 8:00 PM
Updated April 5, 2026
Site work, paving and new construction of an educational facility in Madison, Georgia. Completed plans call for the construction of a educational facility.
Contractors are invited to submit lump sum bids for Bid Package One through Twenty-Nine for the Morgan County Primary and Elementary School. The project includes a new one-story educational building. This facility shall include 115 instructional units, administration, and support space. Bids must be submitted in duplicate on the Construction Manager's Proposal Form along with a 5% Bid Bond if required by the Bid Package. No faxed or emailed bids are accepted. A thorough review of the bid package description and bid documents is required prior to submitting bids. The form of agreement will be AIA Document A401, 2017 Edition, between the Construction Manager and the successful bidder. No additions or edits to this form will be accepted. Bidding Documents are available for the cost of reproduction from Minuteman Press or for review at specified locations and online platforms. The Construction Manager and Owner reserve the right to reject any and all bids and to waive technicalities. Bid Packages include: Sitework, Asphalt Paving/Curb and Gutters, Fences and Gates, Landscaping, Concrete, Masonry, Structural & Miscellaneous Steel, TPO Roofing, Standing Seam Metal Roof Panels, Fireproofing, Hollow Metal Frames/Doors/Finish Hardware, Installation of Doors & Hardware, Aluminum Framed Storefront/Glass & Glazing, Drywall/Ceiling/E.I.F.S./Acoustical Panels, Resilient Flooring/Carpet/Base & Accessories, Decorative Resinous Epoxy Flooring, Athletic Wood Flooring, Painting, Specialties, Visual Display Units, Gymnasium Equipment, Casework, Telescoping Stands, Aluminum Canopies, Food Service Equipment, Plumbing, Fire Protection Sprinkler, H.V.A.C., and Electrical. Review the Bid Package Description, General Package Notes, and the Construction Manager's Special Conditions prior to pricing. Substantial Completion for this building is May 2028 A. Alternate No. 01 Retaining Wall: 1. Base Bid: Provide delegated design concrete retaining wall with brick veneer as noted in sheet C-3.7. 2. Deduct Alternate: Provide delegated design modular block retaining wall in lieu of castin-place concrete wall with brick veneer. B. Alternate No. 02 Cavity Wall Insulation: 1. Base Bid: Provide rigid insulation as noted in drawings and defined in specification section 072100 - Thermal Insulation. 2. Alternate: Substitute rigid insulation occurring in multi-wythe exterior walls with Closed Cell Spray Foam Insulation as defined in specification section 072119 - Foamed In Place Insulation. C. Alternate No. 03: Door Hardware 1. Base Bid: Provide Door Hardware as defined in specification section 087100 Door Hardware. 2. Alternate: Provide the following Door Hardware by the below listed manufacturers meeting specification section 087100 requirements. a. All door locksets by Schlage. D. Alternate No. 04: LVT Flooring 1. Base Bid: Provide LVT as specified in 096519 - Resilient tile flooring. 2. Alternate: Provide Mannington, Color Anchor Collection & Nature's Path Collection Spacia First & Amtico Anthology, full collection for all LVT as indicated in the Construction Documents. E. Alternate No. 05: Food Service Equipment and Cooler / Freezer Assembly 1. Base Bid: Provide food service equipment, and Cooler Freezer Assembly as specified in 114000 - Food Service Equipment, and 114100 - Walk-In Cooler Freezer. 2. Alternate: Provide basis of design equipment specified. Alternate No. 06 HVAC - Major Equipment and Automatic Controls: 1. Base Bid: a. Provide HVAC Major equipment from the listed Basis of Design manufacturers defined in specification section 238000 - HVAC Major Equipment. b. Dehumidification: Reference Sheet M0.2 Rooftop Unit Schedule. Equipment marked with note #6 shall include dehumidification as part of the base bid. c. Provide HVAC automatic controls from any of the listed manufacturers defined in specification section 230900 HVAC Automatic Controls. 2. Alternate: a. Provide the following HVAC major Equipment by the below listed manufacturer as noted in specification section 238000 - HVAC Major Equipment 1) 2.08 Packaged Gas/Electric Rooftop Units (Constant Volume): Carrier 2) 2.09 Packaged Gas/Electric Rooftop Units (Variable Air Volume): Carrier b. Dehumidification: Reference Sheet M0.2 Rooftop Unit Schedule. Equipment marked with Note #11 to include hot gas reheat coil. c. Provide HVAC automatic controls basis of design Carrier I-Vu G. Alternate No. 07 Fire Alarm: 1. Base Bid: Provide complete fire alarm system per specification section 283111 - Fire Alarm. 2. Alternate: Provide basis of design system as manufactured by FireLite.
Post-Bid
Educational
$20,000,000.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2026
June 1, 2026
1631 East Ave, Madison, GA
Related To This Project
Madison, GA
Bid Date: Apr 27 2026
Madison, GA
Bid Date: Jun 12 2026
Madison, GA
--
Madison, GA
Bid Date: Jun 25 2026
Madison, GA
Bid Date: Apr 01 2026
Madison, GA
Bid Date: Mar 16 2026
Madison, GA
Bid Date: Jan 20 2026
Madison, GA
Bid Date: Jan 14 2026
Madison, GA
Bid Date: Dec 12 2025
Madison, GA
Bid Date: Jan 02 2026
Madison, GA
Bid Date: Dec 05 2025
Madison, GA
Bid Date: Nov 21 2025
Madison, GA
Bid Date: Jan 12 2026
Madison, GA
--
Madison, GA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.