BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of a pre-engineered storage facility in Belcourt, North Dakota. Working plans call for the construction of a 44,800-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

As of April 22, 2026 project is on hold. No definite date for the rebid. The Turtle Mountain Band of Chippewa Indians (TMBCI) is requesting Stipulated/Fixed Price Bids for Construction Services for the following Project: Turtle Mountain Band of Chippewa Indians Maintenance Building Expansion Construction of a new 40'x80'X14' cold-climate garage-style pole barn. The building must meet climate frost depths, heavy snow loads and thermal efficiency requirements. The Bid shall include all materials, equipment, and labor necessary to successfully complete the project. The work includes, but not limited to, the following: o Foundation and Structural Specifications. o Column Depth at a minimum of 48 inches to 96 inches. o Footings 16-inch to 24-inch diameter concrete pad with rating @ 5000 psi. o Treated 6x6 or 4X6 post columns, spaced 8 feet on-center. o Concrete collars poured around post base or 2X6 uplift anchors. o For metal siding 2X6 wall girts, spaced 24 inches on-center. o 24-inch-tall minimum R-12 insulation board installed vertically on the inside of the skirt board, with horizontal insulation (R-12 to R-15) extending outward from the slab edge. o 4-inch concrete slab on grade, placed over a 6 mil (or thicker) vapor barrier. o Heating: If using radiant in-floor heating, R-10 insulation is recommended beneath the slab. o Roof & Framing o Trusses must be engineered for local snow loads, typically spaced 4 feet to 8 feet on-center. o 2x4, 24 inches on-center roof purlins. o 4/12 or 8/12 roof pitch. o 12-inch eave and gable overhangs are recommended to protect walls from snow drift and water. o Condensation Control: A double-bubble vapor barrier or proper vapor barrier on the roof is essential for preventing frost/dampness issues. o Garage Specifications o Insulated garage doors. o 36-inch insulated entry door. The expansion shall be constructed per requirements herein, applicable building codes as required for occupancy, and its intended use. The project is located in T162N, R70W Section 29 on the Turtle Mountain Band of Chippewa Indians Reservation. The content of the proposals submitted will remain confidential in nature until an award has been made to the selected company. TMBCI will not consider bids received after the closing date and time. Bids shall contain complete and detailed unit prices for labor, equipment, construction materials, 3% TERO Fee, 1% EPA Fee, and all other appropriate prices. Bidders shall comply with TERO ordinances and Tribal Procurement. Project is approved for state tax exemption. Contractor must possess any and all licenses and permits as may be required by applicable federal, state and/or local laws/ordinances. A copy of the Contractor's business and state license shall be submitted with the Bid. Contractor must provide the ability to secure/hold comprehensive general liability of $1.0 million, auto liability of $1.0 million and worker's compensation of $1.0 million, if selected. If claiming Indian Preference, provide copy of MBE/WBE certification from the state office or proof of Indian Ownership. Owner assumes NO responsibility for misinterpretations of Bid Advertisement. TMBCI reserves the right to reject any and/or all bids and to re-advertise when it is in the best interest of the Tribe.

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$200,000.00

Public - Federal

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
14
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

October 22, 2026

Project location map

208 Aanin Dr. NE, Belcourt, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.