Published January 23, 2026 at 7:00 PM
Updated January 24, 2026
Site work for a civil project in Belcourt, North Dakota. Working plans call for site work for a water / sewer project.
**As of January 23rd, 2026, no bids were received. No definite date for the rebid.** Description: Aquifer which is near Rolette, ND. Construction activities for this schedule will take place in the Rolette and Shell Valley wellfields. Rolette wellfield work includes mechanical, electrical, and sitework improvements and refurbishments to the existing production well sites and control vaults. Installation of new control vaults and site pads is needed for the wells without existing control vaults; Shell Valley includes the installation of new control vaults, wellsite maintenance pads for the 4 existing wells at the Shell Valley wellfield and 1 at the nearby Doc Larson location. This schedule also includes electrical improvements to the existing wellhouse. Schedule B work includes the purchasing and installation of water service meters into current water user's homes in the Turtle Mountain Service Area. Schedule C is located at Booster Pump Station A which includes electrical equipment installation (MCC, VFDs, Control Panel, Heater, Power Meter, etc.), and process mechanical updates, pump furnishing, and installation, and sitework. Schedule D includes electrical updates to the existing Water Treatment Plant's electrical room (Harmonic Filters, MCC1, MCC2, Transformer, PLC Control Panel, and SCP panel), and electrical updates to the Thorne BPS (Harmonics Filter, Soft Start Panel for future well). Schedule E work takes place near the Thorne Reservoir and includes new well investigation: drawdown, recovery, and yield testing. Development and installation of a new production well, control vault, wellsite maintenance pad, and interconnection piping will proceed upon positive testing results for a feasible production well. Question Deadline 12/15/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing.Dan Heitzman, Houston Engineering, 701-751-6272, Questions received less than seven days prior to the date for opening of Bids may not be answered.
Final Planning
Water / Sewer
$5,000,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 22, 2025
July 23, 2026
Rural Rollete County, Belcourt, ND
Related To This Project
Belcourt, ND
Bid Date: Dec 22 2025
Belcourt, ND
Bid Date: Feb 12 2026
Belcourt, ND
Bid Date: Dec 17 2025
Belcourt, ND
Bid Date: Feb 12 2026
Belcourt, ND
Bid Date: Jan 08 2026
Belcourt, ND
--
Belcourt, ND
Bid Date: Nov 13 2025
Belcourt, ND
--
Belcourt, ND
Bid Date: Oct 22 2025
Belcourt, ND
Bid Date: Sep 24 2025
Belcourt, ND
Bid Date: Aug 20 2025
Belcourt, ND
Bid Date: Aug 21 2025
Belcourt, ND
Bid Date: Jun 26 2025
Belcourt, ND
Bid Date: Jul 10 2025
Belcourt, ND
Bid Date: Jun 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.