BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a bridge / tunnel in Tannersville, Pennsylvania. Completed plans call for site work for a bridge / tunnel.

Bids must be accompanied by a certified check or bid bond issued by a Surety licensed to conduct business in the Commonwealth of Pennsylvania, in the amount of at least 10 percent of the total bid. The successful bidder will be required to furnish and pay for a Satisfactory Performance and Payment Bond and Labor and Material Bond in the amount of 100% of the contract amount. A Certificate of Insurance, showing proof of Workers Compensation Coverage, must also be submitted. The project will require minimum wages and salaries to meet the PA Prevailing Wage requirements. The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, national origin, or handicap. Pocono Township reserves the right to reject any or all Bids, to waive any informalities, or take such other action that may deem to be in the best interest of the Township and as may be permitted by law. Bids may be held by the Township for a period of 60 days from the date of Bid opening for the purpose of reviewing Bids and investigating qualifications of bidders, prior to awarding Contract. Prospective bidders are required to attend a Mandatory Pre-Bid Conference at the Pocono Township Municipal Building. Question Deadline 03/27/2026 at 5:00 PM ET All questions concerning the bid documents or the project in general should be submitted through online portal. The project includes the following. 1. Project mobilization and demobilization of all necessary construction/project equipment and/or temporary structures. 2. Installation, maintenance, and removal of erosion and sedimentation controls as shown on the Construction Plans. 3. Sawcut and remove existing asphalt walkway 4. Remove existing concrete abutments, concrete pier, concrete bridge deck, concrete walls, asphalt walkway surface, and steel railings. 5. Excavate for and install new concrete abutments and new concrete wingwalls. Alternate bids are requested to place capstones on each wingwall top and to surface each wingwall face with cultured stone. 6. Install paved walkways. 7. Final site grading and stabilize all disturbed areas with seed and mulch. The pedestrian bridge will be supplied and installed by others. The Contractors shall coordinate schedules accordingly.

Bid Results

Bridges / Tunnels

$127,000.00

Public - City

Site Work

8

10

4

7

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
934
Active Projects
487
Bidding Soon
6,800
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

April 20, 2026

Project location map

2658 PA-715, Tannersville, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.