BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a playground / park / athletic field in Kragmont, British Columbia. Completed plans call for site work for a playground / park / athletic field.

The work of this Contract consists of the supply and installation of materials, including all labour, equipment and tools related to upgrading the Saunders Day Use Area. This opportunity help complete a full refurbishment of the Kikomun Creek Park - Saunders Beach day use area, with a focus on upgrading the accessibiluty of facilities. The components of the work are generally described as follows: Mobilization and demobilization to and from the Project Site, Layout and post construction markups to drawings, environmental management Removal of existing pit toilets and all associated underground infrastructure Removal of existing furniture Removal and abandonment of existing water infrastructure Decommissioning of existing trail section Brushing clearing and grubbing of proposed trail network and common areas around picnic tables Restoration of disturbed areas from clearing, grubbing and grading work Site Directed grading work for furnished areas Reinstating gravel shouldering Installation of 2x bypass trails Installation of new site furniture including: 2x new contractor supplied Panabode Toilets and concrete Vault/lids. Panabode Toilets to be Stained with Proluxe Primary RE Teak 085 two coats 17x new owner supplied picnic tables w/ BBQ stands 17x new owner supplied picnic tables w/ BBQ stands and 8'x10'x6" contractor supplied concrete table pads. 1x contractor supplied Type 3 Information Shelters 2x relocated onsite Waste/recycle receptacles 1x contractor supplied bike rack Signage including: 1x contractor supplied removable traffic stub posts 2x timber sign posts (Contractor supply and installation, Owner supplied signage) Installation of contractor supplied precast parking curbs Dock modifications including extension of 1x 8' x 20' gangway. Line painting including eradicating and re-establishing line paint, stall paint, 2x accessible stalls, and No Parking road marking. Wasa Lake Pit toilet Horseshoe Day Use Removal of existing pit toilet and all associated underground infrastructure 1x new contractor supplied Panabode Toilets and concrete Vault/lids. Panabode Toilet to be Stained with Proluxe Primary RE Teak 085 two coats 1.5m x 2.0m thick asphalt patch c/w subgrade preparation. Adjacent to proposed Wasa Lake Pit toilet upgrade, location to be confirmed onsite by Ministry representative. Documents can be obtained from www.bcbid.gov.bc.ca Award is subject to final approval.

Award

Playgrounds / Parks / Athletic Fields

$249,985.00

Public - State/Provincial

Site Work

10

10

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
6
Bidding Soon
123
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2026

April 27, 2026

Project location map

Kikomun Creek Park, Kragmont, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.