Published June 2, 2026 at 8:00 PM

Updated June 3, 2026

Site work for a bridge / tunnel in Kragmont, British Columbia. Completed plans call for site work for a bridge / tunnel.

This tender includes the detailed design and scope of work to replace the existing pedestrian bridge at the Kikomun Creek Provincial Park. In general, the work consists of the following: .1 The work of this Contract consists of the supply and installation of materials, including all labour, equipment and tools related to the Surveyors Lake Bridge Replacement, all in accordance with the drawings and specifications, and for the prices tendered in the Schedule of Quantities and Unit Price Table. .2 The components of the work are generally described as follows: a. Supply and install two (2) cast-in-place concrete abutments complete with steel reinforcement, frost cushion and three (3) screw piles per each abutment with minimal ground disturbance under original abutment footprint. b. Design, Supply and install 18.0 m clear-span, pre-engineered prefabricated aluminum bridge complete with sliding bearings, bearing plates, anchor bolts, transition cover plates as designed by the bridge fabricator, aluminum dripthrough decking, and railings as shown on the Contract Drawings. Shop drawings shall be prepared, sealed, and signed by a Structural Engineer registered with EGBC and submitted to ISL Engineering for review and approval prior to fabrication. c. Remove and dispose of existing wooden bridge and all related components. d. The work site is primarily accessible by helicopter, with the staging area located at the Upper Parking Lot of Saunders Day Use Area. Removal of the existing bridge span and installation of the new bridge span, as well as transport of all major materials and equipment, will be conducted by helicopter. Personnel and limited small equipment may access the site via an existing 1.0 m wide machine-built access trail. Any impacted trails shall be reclaimed once construction has been completed complete. Schedule: Commence the Work: on or before the 5th day of October 2026. Substantial Performance: on or before the 23rd day of November 2026. Total Performance: on or before the 2nd day of December 2026. Documents can be obtained from www.bcbid.gov.bc.ca Question Deadline 06/17/2026 at 1:00 PM PT

GC Bidding

Bridges / Tunnels

$500,000.00

Public - State/Provincial

Site Work

7

11

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
6
Bidding Soon
123
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2026

October 5, 2026

Project location map

Kikomun Creek Provincial Park, Kragmont, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.