BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 16, 2026 at 8:00 PM

Updated April 3, 2026

Renovation of a mixed-use development in Bloomington, Illinois. Completed plans call for the renovation of a educational facility.

Sealed bids are invited for the Bloomington High School South Gym Renovation, which includes renovations to the locker rooms, installation of new athletic lockers, and new restrooms. The bid packages available cover the following areas: Concrete, Masonry, General Trades, Doors, Frames & Hardware, Framing, Drywall, Ceilings, Flooring, Lockers, Plumbing, HVAC, and Electrical. All questions from bidders must be submitted in writing. Bids must include a bid security (bid bond, certified check, or cashier's check) of 5% of the bid amount, and the successful bidder must provide a Payment and Performance Bond for 100% of the contract amount. The Board of Education reserves the right to reject any and all bids, to waive informalities, and to accept the bid deemed most favorable to its interest after examination. Question Deadline 03/27/2026 at 5:00 PM CT All technical bidding questions during the bidding period should be referred to Mike Lucas from MCP. All questions must be submitted in writing via email at mikelucas@midconpro.com Requests for interpretations shall be made in writing to the Architect/Engineer and Construction Manager. Architect: Farnsworth Group Address: 200 West College Ave., Normal, IL 61761 Contact: Annapoorna Halepatali Email: ahalepatali@F-W.com Phone: 309.663.8435 Construction Manager: Midwest Construction Professionals Address: 520 E. Highland St., Morton, IL 61550 1st Contact: Mike Lucas Email: mikelucas@midconpro.com Phone: 309-208-9254 2nd Contact: Chris Tyra Email: chris@midconpro.com Phone: 309-264-5503 The Project consists of renovating the existing boys and girls locker and rest rooms in the intermediate level. New PE and Athletic lockers are added along with ADA lockers and restrooms to both boys and girls locker areas. A new wheelchair lift and stairs are added connecting the intermediate locker level to the gymnasium lower level making it accessible. A new restroom is added to the existing training rooom at the upper wrestling level. The scope also includes interior finish upgrades throughout the project. A new sidewalk is added to the south side of the building connecting the sidewalk adjacent to Locust street to the south entrances making all of them ADA compliant.

Post-Bid

Educational

$4,000,000.00

Public - County

Renovation

66

24

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
83
Bidding Soon
1,614
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2026

June 1, 2026

Project location map

1202 E Locust St, Bloomington, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.