Site work and paving for a civil project in Downers Grove, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

https://theconstructionbroadsheet.com/plote-burns-mcdonnell-lead-m-illinois-tollway-contract-round-p2229-175.htm The Illinois Tollway Board of Directors approved 12 new construction and professional engineering contracts totaling more than $114 million at its most recent board meeting this month, with Plote Construction Inc. and Burns & McDonnell Engineering Company Inc. coming away with the largest awards. "Contracts approved today will allow us to continue advancing improvements on the Central Tri-State Tollway (I-294) Project, as well as construction on the new I-490 Tollway," said Illinois Tollway Executive Director Cassaundra Rouse. "At the same time, we are committed to the work necessary to keep the roadway pavement and bridges on our existing system well maintained for our 1.7 million daily drivers," Rouse said. Plote Construction, based in Hoffman Estates, Illinois, won a $28.7 million contract for roadway asphalt overlay and pavement marking on the Tri-State Tollway (I-294) from Flagg Creek to Cermak Road. The Tollway board also awarded Burns & McDonnell in Downers Grove, Illinois, a $20.4 million contract for construction management services for roadway and bridge construction on the I-490 Tollway between I-294 and I-90. Other construction contracts awarded in April include: $15.4 million to OHLA Central Inc. in Lisle, Illinois, for roadway and ramp reconstruction and widening on the Tri-State Tollway (I-294); $12.2 million to F.H. Paschen, S.N. Nielsen & Associates in Chicago for pavement rehabilitation on the Veterans Memorial Tollway (I-355) from I-80 to I-55; $11.1 million to Foundation Mechanics in Chicago for grading and drainage improvements on the I-490 Tollway; $10.1 million to K-Five Construction Corp. in Westmont, Illinois, for systemwide pavement repairs; $7 million to Atlas Technical Consultants in Chicago for design services for intelligent transportation system (ITS) deployment and system management systemwide; $2.5 million to Rausch Infrastructure in Des Plaines, Illinois, for bridge rehabilitation on the Reagan Memorial Tollway (I-88); $2.7 million to Lorig Construction Co. in Des Plaines, Illinois, for bridge rehabilitation on the Tri-State Tollway (I-94/294); $1.8 million to Gasperec Elberts Consulting, Downers Grove, IL, for design services for interchange construction on Reagan Memorial Tollway (I-88)/Tri-State Tollway (I-294) connector ramps; $1.1 million to RoadSafe Traffic Systems Inc. in Romeoville, Illinois, for systemwide pavement marking improvements; and $1 million to Veterans Vac Services in McHenry, Illinois, for oasis parking lot demolition at the Hinsdale Oasis and at the O'Hare Oasis on the Tri-State Tollway (I-294). Overall, the Tollway said it has invested more than $12.2 billion since 2012, with more than $3.2 billion of that total committed to small, diverse and veteran-owned firms. Now in the 15th year of its 16-year, $15 billion Move Illinois capital program, the Tollway has awarded more than $219 million of contracts in 2026, including almost $50 million as part of Move Illinois and more than $169 million as part of the seven-year, $2 billion Bridging the Future plan. The Illinois Tollway plans a total 2026 capital investment of almost $1.3 billion. ------------------------------------------------------- RR-26-2037 Veterans Memorial I-355 Pavement & Structural Rehab I-55 to Army Trail MP 12.3 to MP 29.9. Pursuant to CPO Notice 2023.12, only electronic submissions for competitive solicitations will be accepted. Paper responses will not be accepted. For more details regarding required documents, refer to Volume I. See the attachment titled cpo-notice-2023.12 electronic-submission for more information. Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 9241D.2037_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on March 27, 2026.

Award

Roads / Highways

$8,639,777.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
497
Active Projects
300
Bidding Soon
4,389
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2026

July 20, 2026

Project location map

Multiple Locations, Downers Grove, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.