BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an educational facility in Keokuk, Iowa. Completed plans call for the renovation of a educational facility.

Sealed proposals are requested for the George Washington Elementary - Multi-User Restroom Renovation, to be received by the Keokuk Community School District. Bids are for a single prime contract. Each bid must be submitted on a form provided by the Architect/Engineer and must include a certified check or bid bond for 5% of the base bid, which may be retained by the District as liquidated damages if the bidder fails to execute a contract and file an approved bond for 100% of the contract price. Bidding documents, including drawings and specifications, are available at www.klingnerplanroom.com. Bidders are strongly encouraged to register as a Prime Bidder or Sub-Contractor to receive bid-related notices and be listed as a plan holder. Bidding documents can also be ordered in paper copy at no charge. Technical questions should be directed to the Project Administrative Assistant at Klingner & Associates PC. The contract may be awarded to the lowest responsive responsible bidder according to Iowa Code requirements. Preference will be given to products and labor from Iowa. All bids are subject to governing state laws and Board policies. The project is sales tax exempt, and an exemption certificate will be issued for materials used in the contract. Technical questions regarding interpretations of the bidding documents shall be directed to Amanda Springer, Project Administrative Assistant of Klingner & Associates PC at aspringer@klingner.com and NOT City Blue Technologies The Work of Project is defined by the Contract Documents and consists of the following: The project includes replacing existing HVAC equipment including; the chiller, boiler, air handling units, unit ventilators, and exhaust fans. The project also includes a new HVAC controls system to control all HVAC equipment and upgrading the fire alarm system to a voice annunciated system. The chiller has been pre-purchased in a separate project; however, the chiller installation is included as part of this project.

Bid Results

Educational

$245,546.00

Public - County

Renovation

12

12

14

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

May 6, 2026

Project location map

116 N 8th St, Keokuk, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.