BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Murray, Utah. Completed plans call for site work for a water / sewer project.

Question Deadline 03/24/2026 at 5:00 PM MT Questions, clarifications, or requests for information must be submitted in writing to the Euna Procurement Q&A Section. If there are any questions outside of the scope of work, please direct those to the City's Purchasing Agent, Amandah Maudsley (amaudsley@murray.utah.gov). The Work of this Contract consists of the rehabilitation of approximately 8,576 linear feet of 8-inch to 15-inch vitrified clay pipe (VCP) and reinforced concrete pipe (RCP), protruding sewer lateral cutting, sewer lateral reinstatements, sewer bypass pumping, and associated work in accordance with the Contract Documents. The Spring 2026 CIPP Sewer Lining Project is a public works construction project for Murray City focused on rehabilitating existing sanitary sewer pipelines using cured-in-place pipe (CIPP) technology. The project is designed to extend the service life of aging sewer infrastructure, reduce infiltration and inflow, and improve overall system reliability without the need for full pipe replacement. The work includes furnishing all labor, equipment, materials, traffic control, bypass pumping, surface restoration, and related services necessary to complete the lining of designated sewer segments. The project utilizes unit price bidding, and final payment will be based on actual measured quantities installed in accordance with the contract documents. The contractor will be required to coordinate with City staff and the project engineer, comply with all safety requirements, and complete the work within the contract time specified in the Agreement. This project supports Murray City's ongoing infrastructure maintenance program and commitment to maintaining safe, reliable, and cost-effective public utilities. $600,000 to $700,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$700,000.00

Public - City

Site Work

17

15

6

7

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
121
Bidding Soon
1,306
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

April 17, 2026

Project location map

Multiple Locations, Murray, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.