BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2026 at 8:00 PM

Updated April 3, 2026

Site work for an educational facility in Fenton, Missouri. Completed plans call for site work for a educational facility.

The project scope includes the removal and replacement of existing concrete pavement with new at Rockwood Summit High School's entry plaza. Bidders are instructed to submit a bid following the provided specifications for this location. There is a mandatory pre-bid meeting at Rockwood Summit High School, and only those who attend may submit a qualifying bid. Plans and specifications will be distributed only at the mandatory pre-bid meeting. All bids must be submitted by the specified deadline, using the forms provided, and may be turned in before the deadline. If the district is closed due to inclement weather, the pre-bid meeting or bid due date will be rescheduled for the next business day when the district is open.

Post-Bid

Educational

$200,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
81
Bidding Soon
949
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2026

May 17, 2026

Project location map

1780 Hawkins Road, Fenton, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.