Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 7, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a water / sewer project in Ocala, Florida. Working plans call for the renovation of a water / sewer project.
Bid cancelled The new centrifuge unit will be delivered to and installed on the ground floor of the WRF #3 Dewatering Building at 3100 SW 67th Avenue Rd, Ocala FL 34474. The Vendor shall ensure proper alignment and stability. The Vendor shall supply the centrifuge with a support frame, rotating separation unit (bowl), scroll conveyor, main drive motor with variable frequency drive, bearings, seals, feed tube, liquid polymer mixing system, discharge auger, control panel, monitoring instrumentation, flowmeters, and other necessary appurtenances. The Vendor will make provisions for discharge of the centrate to a common drain system. The centrifuge system shall demonstrate through performance testing the ability to treat biosolids sludge to a minimum of 20% total cake solids. The City will provide piping to the front of the centrifuge to convey wastewater sludge to the unit. Please enter your total lump sum cost to provide and install a centrifuge as described in Exhibit A- Scope of Work and calculated in Exhibit B - Price Proposal, HERE Question Deadline 04/02/2026 at 5:00 PM ET All work must be coordinated with City Project Manager, William Davis, WRF #3 Lead Operator, Telephone 352-572-0418 or 352-629-8471, E-mail: WDavis@Ocalafl.gov. OND REQUIREMENTS 1. Bid Bond: Bid security equal to five percent (5%) of the total bid amount must accompany each bid. Bid bond will be uploaded in the section of this listing labeled "Bid Bond." The original document will be maintained by the Bidder unless requested to produce by the City. 2. Performance and Payment Bond: The successful Bidder must submit a Performance and Payment bond for the total bid amount. 3. Maintenance and Guarantee Bond: The successful Bidder will also be required to furnish a Maintenance and Guarantee Bond for the total project value, prior to final payment, for a period of three (3) years for labor and three (3) years for materials from the date of final completion.
Final Planning
Water / Sewer
$400,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2026
October 7, 2026
3100 SW 67th Ave, Ocala, FL
Related To This Project
Ocala, FL
Bid Date: Apr 14 2026
Ocala, FL
Bid Date: Mar 24 2026
Ocala, FL
Bid Date: Apr 02 2026
Ocala, FL
Bid Date: Mar 24 2026
Ocala, FL
Bid Date: Mar 24 2026
Ocala, FL
Bid Date: Apr 14 2026
Ocala, FL
Bid Date: Apr 10 2026
Ocala, FL
Bid Date: May 06 2026
Ocala, FL
Bid Date: May 14 2026
Ocala, FL
Bid Date: Mar 12 2026
Ocala, FL
Bid Date: Mar 24 2026
Ocala, FL
Bid Date: Mar 25 2026
Ocala, FL
Bid Date: Apr 07 2026
Ocala, FL
Bid Date: Apr 07 2026
Ocala, FL
Bid Date: Mar 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
