BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a playground / park / athletic field in Winnipeg, Manitoba. Completed plans call for site work for a playground / park / athletic field.

The work consists of removals, installation of new baseball backstop and dugout fencing, new granular pads and benches, new infield mix, and soil and sod. The major components are: removals; supply and installation of 5.49m height chain link backstop fencing; supply and installation of 1.83m height chain link dugout fencing with benches; supply and installation of granular pads; supply and installation of baseball infield mix; and supply and installation of soil and sod. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 03/18/2026 All enquiries shall be directed to the Contract Administrator identified in D4.1. B4.2 If the Bidder finds errors, discrepancies or omissions in the Tender, or is unsure of the meaning or intent of any provision therein, the Bidder shall notify the Contract Administrator of the error, discrepancy or omission, or request a clarification as to the meaning or intent of the provision at least five (5) Business Days prior to the Submission Deadline. Award is subject to final approval

Award

Playgrounds / Parks / Athletic Fields

$89,517.00

Public - City

Site Work

5

6

4

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
84
Bidding Soon
681
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2026

July 1, 2026

Project location map

1405 Wellington Crescent, Winnipeg, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.