Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 11, 2026 at 8:00 PM
Updated March 12, 2026
Renovation of a military facility in Fort Carson, Colorado. Conceptual plans call for the renovation of a military facility.
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and all other non-personal services required to furnish and install new Absolyte Valve-Regulated Lead-Acid (VRLA) battery cells, modular steel tray housings, positive and negative terminate plates, and flame-retardant transparent module covers with standoffs for one communication node. All battery cells must be the same brand and equal in amp-hours as the existing system and must be new, not refurbished or renewed. Work includes reconnecting the existing alarm/control cable harness to each battery cell, reinstalling the Ni-Cad Neutra Mat as specified, and disposing of the removed batteries in accordance with Colorado and EPA requirements. The contractor shall provide labor for full installation, ensure compatibility with existing systems, and deliver all components required by the Performance Work Statement. Location: Fort Carson, 6303 Wetzel Ave, Fort Carson, CO 80913 The Method of Contractor Selection has not been determined at this Time.
Conceptual
Military
$200,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 16, 2027
To Be Determined, Fort Carson, CO
Related To This Project
Fort Carson, CO
--
Fort Carson, CO
Bid Date: Sep 18 2025
Fort Carson, CO
Bid Date: Sep 18 2025
Fort Carson, CO
Bid Date: Sep 19 2025
Fort Carson, CO
Bid Date: Jul 24 2025
Fort Carson, CO
Bid Date: May 23 2025
Fort Carson, CO
Bid Date: Apr 04 2025
Fort Carson, CO
Bid Date: Sep 24 2024
Fort Carson, CO
--
Fort Carson, CO
Bid Date: Jun 15 2022
Fort Carson, CO
Bid Date: Aug 31 2023
Fort Carson, CO
Bid Date: Jun 25 2023
Fort Carson, CO
Bid Date: Mar 15 2023
Fort Carson, CO
--
Fort Carson, CO
Bid Date: Jan 26 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
