BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 16, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a road / highway in Milton, Florida. Completed plans call for site work for a road / highway.

Road Name: Milton Ops Maint - Ls Remove and Replace Thermoplastic Limits: Midpoint Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Special Start Date: N/A Aquis/Flexible Start Time: 15 Days Description: The improvements under this Site-Specific, Lump Sum contract consist of removal and replacement of all thermoplastic pavement markings, permanent tape and reflective pavement markers on SR 281 in Santa Rosa County, at locations shown in the Appendices. All work will be performed at night, and a Traffic Control Officer will be required for most Work Zones. A Contractor Experience Form (850-070-06), Experience in Pavement Markings, is required to be submitted with bid. Question Deadline 04/02/2026 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. FDOT - 002 - Pavement Markings - SR 281

Award

Roads / Highways

$254,059.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

May 11, 2026

Project location map

Multiple Locations, Milton, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.