Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 11, 2026 at 8:00 PM
Updated March 12, 2026
Site work for a road / highway in Milton, Florida. Completed plans call for site work for a road / highway.
Road Name: Milton Ops Maint - Ls Remove and Replace Thermoplastic Limits: Midpoint Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Special Start Date: N/A Aquis/Flexible Start Time: 15 Days Description: The improvements under this Site-Specific, Lump Sum contract consist of removal and replacement of all thermoplastic pavement markings, permanent tape and reflective pavement markers on SR 281 in Santa Rosa County, at locations shown in the Appendices. All work will be performed at night, and a Traffic Control Officer will be required for most Work Zones. A Contractor Experience Form (850-070-06), Experience in Pavement Markings, is required to be submitted with bid. Question Deadline 04/02/2026 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. FDOT - 002 - Pavement Markings - SR 281
Sub-Bidding
Roads / Highways
$300,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
April 20, 2026
Multiple Locations, Milton, FL
Related To This Project
Milton, FL
Bid Date: Apr 09 2026
Milton, FL
--
Milton, FL
--
Milton, FL
Bid Date: Mar 30 2026
Milton, FL
Bid Date: Feb 23 2026
Milton, FL
Bid Date: Mar 10 2026
Milton, FL
--
Milton, FL
--
Milton, FL
Bid Date: Feb 17 2026
Milton, FL
Bid Date: Mar 12 2026
Milton, FL
Bid Date: Mar 12 2026
Milton, FL
--
Milton, FL
Bid Date: Feb 26 2026
Milton, FL
--
