BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a bridge / tunnel in Livermore, California. Completed plans call for site work for a bridge / tunnel.

The project consists of providing all labor, material, equipment, mechanical workmanship, transportation, and services required for the storm damage repair of Collier Canyon Road at mile marker 3.66 in Murray Township, Alameda County, California. General work includes providing construction area signs; preparing and implementing a traffic control plan; preparing and implementing a stormwater pollution prevention plan; managing the construction site; sweeping streets; coordinating with utility companies, businesses, and property owners; clearing and grubbing; performing construction survey staking; carrying out minor roadway excavation and site grading; replacing damaged concrete wing wall sections; repairing slopes at the box culvert outlet and the storm-damaged roadway shoulder; constructing two new mechanically stabilized earth (MSE) retaining walls; placing rock slope protection; installing metal barrier guardrails; restoring damaged pavement; and cleaning the site upon completion. Bids must include a security of at least 10 percent of the bid. The Contractor must have a valid Class A license and be registered with the Department of Industrial Relations throughout the contract duration. All contractors and subcontractors must pay at least the prevailing wage rates. There is a mandatory pre-bid meeting for all prime contractors. Bids must comply with CARB In-Use Off-Road Diesel-Fueled Fleets Regulation and provide valid Certificates of Reported Compliance, if applicable. The Board of Supervisors reserves the right to reject any or all bids or items. Question Deadline 03/31/2026 Direct questions regarding bid submission to 510-670-5450. Submit bid questions as described in the Special Notices that accompany the Special Provisions. Questions not submitted 5 business days before bid opening will not be considered for response

Post-Bid

Bridges / Tunnels

$5,000,000.00

Public - County

Paving, Site Work

23

10

7

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
550
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

May 7, 2026

Project location map

Collier Canyon Rd, Livermore, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.