BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in New Castle, New Hampshire. Completed plans call for site work for a water / sewer project.

The work consists of repair and rehabilitation of waterfront infrastructure at USCG Station Portsmouth Harbor under Phase 2 of the project. The base bid includes chinking and repointing the north quay wall; repairing sinkholes and voids at the dumpster pad area east of the quay wall through partial demolition, excavation, construction of a concrete closure wall, backfill, and restoration with base course and bituminous pavement; and removal and replacement of existing fencing along the north quay wall within the limits of repair. Additional base work includes repairs to the south quay wall using an interim stone berm, repair of voids in the quay wall face, and repair of a sinkhole behind the wall; restoration of the north rip-rap revetment; repair of sinkholes and voids in the west parking area behind the north revetment including pavement removal, backfill, and resurfacing; removal and replacement of fencing at the top of the north revetment; recoating wave screen guide piles from mean low water to the top of piles, replacement of a broken cleat, and installation of sacrificial anodes; and installation of a new timber floating dock to replace a previously removed concrete floating dock damaged by storm events. Option Bid Item 1 includes construction of a rip-rap revetment extending the west end of the existing south quay wall to fill lower-elevation areas of adjacent ledge outcroppings. Option Bid Item 2 includes installation of high-density polyethylene pile sleeves on existing steel piles associated with the wave screen and floating dock. All work shall be performed in accordance with the project specifications, drawings, applicable local, state, and federal codes, and all required permitting. Location: USCG Station Portsmouth Harbor, 100 Shapleigh Road, New Castle, NH 03854 Request for Information (RFI)/Questions Due Date: 14 April 2026 at 2:00PM EST Submit any QUESTIONS to the Contract Specialist via email at cameron.h.ormiston@uscg.mil Construction Magnitude: The magnitude of this construction project is between $1,000,000 and $5,000,000 IAW FAR 36.204. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SCOPE OF WORK: Contractor shall provide all labor, equipment, and materials necessary to perform Phase 2 Waterfront Repairs at the USCG Station Portsmouth Harbor, New Castle, New Hampshire All work shall be accomplished in accordance with project specifications for PSN 16654142, Drawings for PSN 16654142 (16 sheets), federal and state permits (see Appendix A of the Specifications) and the applicable wage rates incorporated herein

Bid Results

Water / Sewer

$1,209,279.00

Public - Federal

Site Work

18

18

2

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2026

June 29, 2026

Project location map

25 Wentworth Rd, New Castle, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.